Amends the Public Utilities Act. Provides that, to assist and support the Illinois Commerce Commission in the development of renewable energy access plan updates, the Commission may retain the services of technical and policy experts with relevant expertise and experience. Provides that the procurement is exempt from the requirements of the Illinois Procurement Code. Amends the Illinois Procurement Code to make a conforming change. Effective immediately.
Amends the Public Utilities Act. Sets forth procedures for the processing of interconnection requests from applicants for distributed renewable generation projects on public school land. Provides that, for all net metering credits or other credits owed to a customer who has elected to install a distributed renewable generation project on public school land, all credits intended for the benefit of the consumer must be credited by the public utility or retail energy supplier within 90 days after the public utility or retail energy supplier determines that the criteria for the credit have been met. Provides that the Illinois Commerce Commission shall adopt revisions to its standards for the interconnection of eligible renewable generating equipment and net metering credit rules to conform with the requirements of the provisions of the amendatory Act. In provisions concerning customer self-generation of electricity, provides that, for distributed renewable generation projects on public school land, any fees for interconnection applications charged by the electric cooperative or municipal system must be substantially similar to the fees charged by public utilities for the interconnection of the same or similar projects and must not exceed 150% of the cost of the base interconnection fees of the other public utilities. Effective immediately.
Amends the Public Utilities Act. In provisions concerning nondiscrimination, provides that the Commission is authorized to approve a low-income discount rate for residential electric and natural gas customers that applies to the entirety of a qualifying customer's bill, including, but not limited to, a qualifying customer's delivery service charges and energy supply charges. Provides that an electric or natural gas utility may fund low-income discount rates through a surcharge on customers' electric and natural gas bills. Provides that the changes to the Act apply retroactively on and after January 1, 2023. Amends the Energy Assistance Act. In provisions concerning eligibility under the Act, provides that, in setting the annual eligibility level for the use of State funds from the Supplemental Low-Income Energy Assistance Fund, the Department of Commerce and Economic Opportunity shall consider the amount of available funding and may not set a limit higher than 300% of the federal nonfarm poverty level. In provisions concerning the Supplemental Low-Income Energy Assistance Fund, provides that the yearly administrative expenses of the Fund may not exceed 15% (rather than 13%) of the amount collected during that year, except when unspent funds from the Fund are reallocated from a previous year. Provides that any unspent balance of the 15% administrative allowance may be utilized for administrative expenses in the year they are reallocated. Provides that, of the 15% administrative allowance, no less than 9% (rather than 8%) shall be provided to Local Administrative Agencies for administrative expenses. Provides that, beginning January 1, 2027, the Base Energy Assistance Charge shall be $0.80 per month for each utility that is required by the Illinois Commerce Commission to implement a low-income discount rate and shall be $0.40 per month for each utility that is not required to implement a low-income discount rate and that contributes to the Supplemental Low-Income Energy Assistance Fund. Makes other changes.
Creates the Illinois Appliance Standards Act. Directs the Illinois Environmental Protection Agency to adopt minimum efficiency standards for covered products. Provides for testing, certification, and labeling of covered products. Contains provisions concerning enforcement of the Act's requirements. Provides for administrative rulemaking by the Agency. Makes findings. Defines terms.
Creates the Electric Transmission Colocation and Siting Priority Act. Defines terms. Requires that, in the siting of new electric transmission facilities, available corridors be used in the following order of priority: (1) existing public utility corridors; (2) State highway corridors; and (3) new corridors. Provides that a public utility or transmission developer may construct, place, or maintain a high-voltage transmission line on a public right-of-way or along a highway if (i) the public utility or transmission developer submits a colocation request for the high-voltage transmission line to the Secretary of Transportation and (ii) the Secretary reviews and approves the colocation request. Provides that the Secretary may deny a colocation request if the Secretary determines that the construction, placement, or maintenance of a high-voltage transmission line on a public right-of-way or along a highway would endanger public safety or would interfere with the proper function of the highway. Provides that a public utility or transmission developer may submit a written request to the Department of Transportation for an evaluation of certain corridors for possible locations for a high-voltage transmission line. Provides that, within 30 days after receipt of a written request, the Secretary shall assign a project coordinator to the request. Provides that a project coordinator, upon assignment to a request, shall begin the evaluation in coordination with the applicable public utility or transmission developer. Requires a public utility or transmission developer to develop a constructability report in consultation with the Department and requires the public utility or transmission developer and the Department to follow the terms and conditions of the constructability report during the planning and approval process for the siting of a high-voltage transmission line. Sets forth requirements for the content of the constructability report. Provides that, if the Department requires that a high-voltage transmission line on a public right-of-way be relocated by a specific date, the Department shall give the applicable public utility or transmission developer notice of the required relocation no less than 10 years before the date of the required relocation. Makes other changes. Effective January 1, 2027.
Creates the Electric Transmission Facilities Siting Act. Defines terms. Requires that, in the siting of new electric transmission facilities, available corridors be used in the following order of priority: (1) existing public utility corridors; (2) highway corridors; and (3) new corridors. Provides that a public utility or developer may construct, place, or maintain a high-voltage electric service line on a public right-of-way or along a highway if (i) the public utility or developer submits a colocation request for the high-voltage electric service line to the Secretary of Transportation and (ii) the Secretary reviews and approves the colocation request. Requires a public utility or developer to develop a constructability report in consultation with the Department of Transportation and requires the public utility or developer and the Department to follow the terms and conditions of the constructability report during the planning and approval process for the siting of a high-voltage electric service line. Sets forth requirements for the content of the constructability report. Amends the Public Utilities Act. In provisions concerning distributed generation rebates, provides that the owner or operator of distributed generation that, before January 1, 2025 (rather than before the threshold date), is eligible for net metering under the Act may apply for a base rebate for an associated energy storage device behind the same retail customer meter as the distributed generation, regardless of whether the distributed generation applies for a rebate for the distributed generation device. Provides that, after the threshold date, a stand-alone energy storage system that is neither paired with distributed generation nor with any electric load beyond the electric load that is used by the energy storage system itself (rather than a stand-alone energy storage system) shall be compensated with a rebate of $250 per kilowatt-hour of nameplate capacity. Amends the Environmental Protection Act. In provisions concerning greenhouse gases, provides that the Environmental Protection Agency and the Illinois Power Agency shall file a plan to reduce or delay certain emissions reductions requirements with the Illinois Commerce Commission for review in conjunction with the integrated resource plan under certain provisions of the Public Utilities Act. Makes other changes. Effective immediately.
Amends the Illinois Vehicle Code. Provides that a vehicle or combination of vehicles operated by an engine fueled wholly or partially by an electric battery or hydrogen fuel cell electric fueling system may exceed the posted weight limits by up to 2,000 pounds.
HB 3510 amends the existing Energy Efficient Building Act. The bill specifically modifies the adoption dates for "stretch energy codes," which are building standards designed to enhance energy efficiency. These codes incorporate "site energy index standards," likely metrics for measuring a building's energy performance. This legislation primarily adjusts the timeline for when these updated energy efficiency requirements will take effect for new construction and renovations.
Amends the Renewable Energy, Energy Efficiency, and Coal Resources Development Law of 1997. Extends the repeal of the Act until December 31, 2030. Effective immediately.
Amends the Renewable Energy, Energy Efficiency, and Coal Resources Development Law of 1997. Extends the repeal of the Act until December 31, 2030. Effective immediately.