SB 1759 appropriates $50,000,000 to the Department of Transportation (IDOT). This funding is specifically designated for the expansion of Route 6. The project will focus on the section of Route 6 located between Brisbin Road and Ridge Road. The bill is set to become effective on July 1, 2025.
Urges the Illinois Department of Transportation to conduct a study on the feasibility and potential impacts of expanding all interstates in Illinois to a minimum of six lanes and all secondary roads on commercial corridors to a minimum of four lanes.
Amends the Illinois Highway Code. Provides that the prohibition on incurring development costs, placing improvements upon or under land, rebuilding, altering, or adding to any existing structure when widening or adding to the State highway system does not apply if the Department of Transportation has not held its mandated public hearing. Provides that if the Department does not hold a public hearing regarding the viability and feasibility of a protected corridor, the protected corridor shall be abolished.
Makes appropriations for the ordinary and contingent expenses of the Department of Transportation for the fiscal year beginning July 1, 2025, as follows: Other State Funds $4,899,739,695; Federal Funds $15,924,125; Total $4,915,663,820.
Amends the Innovations for Transportation Infrastructure Act. Provides that the Department of Transportation or the Illinois State Toll Highway Authority may use the design-build project delivery method for transportation facilities if the capital costs for transportation facilities delivered utilizing the design-build project delivery method or Construction Manager/General Contractor project delivery method or Alternative Technical Concepts in a design-bid-build project delivery method do not for transportation facilities delivered by the Department, exceed the value of 20% of the projects annually programmed in (rather than $400 million of contracts awarded during) the Department's multi-year highway improvement program on an annual basis (rather than for any 5-year period). Removes language that provides that notwithstanding any other law, and as authority supplemental to its existing powers, the Department may use the Construction Manager/General Contractor project delivery method for up to 2 transportation facilities per year. Effective immediately.
Appropriates $350,000,000 to the Department of Transportation for the construction, land acquisition, and any other required infrastructure changes for a new interchange at Minooka Road on I-80 to accommodate current and expected increases to traffic volume. Effective July 1, 2025.