Sponsored bills
Establishes parameters regarding applications for zoning approvals for certain wireless support structures. Applications for certain new wireless support structures that are 50 feet or less above ground level and for the co-location on an existing structure of a wireless facility that is not a small cell facility are exempt from requirements that they obtain a special exception, special use permit, or variance, though a locality may require administrative review for the issuance of any zoning permits or an acknowledgement that zoning approval is not required for such projects. Aspects of the zoning approval process addressed in this measure include periods for approval or disapproval of applications; a requirement that applications are deemed approved if not approved or disapproved within the applicable period; application fees; a prohibition against unreasonably discriminating between applicants and other wireless services providers, providers of telecommunications services, and nonpublic providers of cable television and electric services; and limits on the number of new wireless support structures that can be installed in a specific location. The measure prohibits a locality, in its receiving, consideration, and processing of an application for zoning approval, from engaging in certain activities. The measure states that it does not prohibit a locality from disapproving an application submitted under a standard process project on the basis of the availability of existing wireless support structures within a reasonable distance that could be used for co-location at reasonable terms and conditions without imposing technical limitations on the applicant. The measure also requires that any publicly owned or privately owned wireless service provider operating within the Commonwealth or serving residents of the Commonwealth shall, by January 1, 2019, and annually thereafter until January 1, 2025, provide to the Department of Housing and Community Development a report detailing, by county, city, or town, enhanced service capacity in previously served areas and expansion of service in previously unserved geographic areas that are provided access to wireless service. This bill is identical to
Provides the Secretary of Veterans and Defense Affairs (the Secretary) with greater direct oversight of the Department of Veterans Services (the Department). The bill requires (i) that the current cost-benefit and value analysis of existing programs and services and for new programs and services before they are established and implemented be conducted annually, with the results provided to the Secretary, and (ii) that the Department submit an annual report through the Secretary to the Governor and the General Assembly on or before December 1 of each year. The bill contains technical amendments.
Establishes parameters regarding applications for zoning approvals for certain wireless support structures. Applications for certain new wireless support structures that are 50 feet or less above ground level and for the co-location on an existing structure of a wireless facility that is not a small cell facility are exempt from requirements that they obtain a special exception, special use permit, or variance, though a locality may require administrative review for the issuance of any zoning permits or an acknowledgement that zoning approval is not required for such projects. Aspects of the zoning approval process addressed in this measure include periods for approval or disapproval of applications; a requirement that applications are deemed approved if not approved or disapproved within the applicable period; application fees; a prohibition against unreasonably discriminating between applicants and other wireless services providers, providers of telecommunications services, and nonpublic providers of cable television and electric services; and limits on the number of new wireless support structures that can be installed in a specific location. The measure prohibits a locality, in its receiving, consideration, and processing of an application for zoning approval, from engaging in certain activities. The measure states that it does not prohibit a locality from disapproving an application submitted under a standard process project on the basis of the availability of existing wireless support structures within a reasonable distance that could be used for co-location at reasonable terms and conditions without imposing technical limitations on the applicant. The measure also requires that any publicly owned or privately owned wireless service provider operating within the Commonwealth or serving residents of the Commonwealth shall, by January 1, 2019, and annually thereafter until January 1, 2025, provide to the Department of Housing and Community Development a report detailing, by county, city, or town, enhanced service capacity in previously served areas and expansion of service in previously unserved geographic areas that are provided access to wireless service. This bill is identical to
Defines "agricultural products," for the purposes of the classification of tangible personal property for taxation, as any livestock, aquaculture, poultry, horticultural, floricultural, viticulture, silvicultural, or other farm crops. This bill is identical to