HB 2752 modifies Oklahoma's eminent domain rules for electricity providers, prohibiting the use of eminent domain for renewable energy facilities (like wind, solar, battery storage, or hydrogen projects) on private property. It requires electricity companies seeking eminent domain for high-voltage transmission lines (>300 kV) to first obtain a Certificate of Authority from the Corporation Commission. The bill directly affects electricity providers, private landowners, and renewable energy developers by restricting eminent domain access for renewables and adding a regulatory step for major infrastructure. It takes effect November 1, 2025.
SB 998, now law in Oklahoma, changes how electric utilities regulated by the Corporation Commission recover costs for specific projects. It presumes certain transmission upgrade costs (including those for wind development approved by the Southwest Power Pool) and environmental compliance costs (like Clean Air Act upgrades) are recoverable through rate adjustments, unless rebutted by evidence. The bill also streamlines approval for new power generation facilities or purchased power contracts, requiring the Commission to act within 240 days (180 days for natural gas plants) after applications, with costs deemed recoverable upon approval. These changes directly affect Oklahoma utilities seeking to recover infrastructure and compliance expenses from ratepayers.
HB 1205 repeals Oklahoma's tax credit for small wind turbine installations by removing Section 2357.32B from the state's tax code. This change directly affects small wind turbine owners and installers who previously qualified for the credit. The repeal takes effect on November 1, 2025, eliminating the tax incentive for new installations after that date. The bill is procedural and does not create new policy, only removing an existing tax provision.
HB 2037 removes specific energy conservation rules from Oklahoma law by repealing Sections 456, 457, and 458 of Title 19 O.S. 2021 and Section 5-131.2 of Title 70 O.S. 2021. This bill eliminates existing statutory requirements related to energy conservation without creating new provisions. It takes effect on November 1, 2025, after being approved by the governor on May 9, 2025. The repeal directly affects the legal framework governing energy conservation in Oklahoma, removing these specific sections from the state code.
HB 1372 temporarily lowers the gross production tax rate for oil and gas from existing wells (spudded before the law's effective date) to 5% for 36 months, instead of the standard 7%. It also creates two new tax exemptions: 1) 5 years of tax-free production for secondary/tertiary recovery projects approved after July 2022, and 2) a 24-month tax exemption for wells using recycled water (proportional to recycled water usage). For orphaned wells, producers must post a $25,000 surety bond per well to qualify for a 50% tax reduction for 36 months. The bill sets annual refund limits of $15 million for recovery projects and $10 million for recycled water exemptions, requiring producers to apply for refunds through the Tax Commission.
SB 460 establishes natural gas as the preferred fuel source for new fossil fuel electricity generation facilities in Oklahoma, requiring all new plants built after July 1, 2025, to use natural gas unless a generator can demonstrate to regulators that another fossil fuel better serves consumers. The bill amends Oklahoma law to create a "natural gas energy standard" that supplements renewable energy goals, specifically targeting new construction and added capacity at existing fossil fuel plants. This policy directly affects electricity generators planning new facilities or expansions, shifting the default fuel choice from other fossil fuels to natural gas. The law takes effect July 1, 2025, and was enacted as an emergency measure.
SB 291 creates a refundable income tax credit for Oklahoma residents based on revenue growth from oil, natural gas, and corporate income taxes. If the State Board of Equalization certifies that revenue growth exceeds 10% in a year, the Oklahoma Tax Commission calculates a credit amount using a formula based on the number of individual and married-filing-jointly tax returns from the prior year. The credit is doubled for married couples filing jointly, and the Commission must publish the calculated amount within 45 days of certification. The credit applies to tax years starting in 2026, with a November 1, 2025 effective date.
SB 352 prohibits utility companies from using eminent domain to build wind turbines, solar facilities, battery storage, or hydrogen gas facilities on private property. It also requires electricity providers to obtain a Corporation Commission certificate before using eminent domain for high-voltage transmission lines (over 300 kV). The bill directly affects utility companies seeking to expand infrastructure and private property owners whose land might be targeted for such projects. These changes amend Oklahoma’s eminent domain law (27 O.S. §7) to restrict certain facility siting and add oversight for major transmission projects. The bill was introduced in the 2025 Oklahoma Legislature and referred to the Energy and Natural Resources Oversight committee.