HB 2037 removes specific energy conservation rules from Oklahoma law by repealing Sections 456, 457, and 458 of Title 19 O.S. 2021 and Section 5-131.2 of Title 70 O.S. 2021. This bill eliminates existing statutory requirements related to energy conservation without creating new provisions. It takes effect on November 1, 2025, after being approved by the governor on May 9, 2025. The repeal directly affects the legal framework governing energy conservation in Oklahoma, removing these specific sections from the state code.
HB 1372 temporarily lowers the gross production tax rate for oil and gas from existing wells (spudded before the law's effective date) to 5% for 36 months, instead of the standard 7%. It also creates two new tax exemptions: 1) 5 years of tax-free production for secondary/tertiary recovery projects approved after July 2022, and 2) a 24-month tax exemption for wells using recycled water (proportional to recycled water usage). For orphaned wells, producers must post a $25,000 surety bond per well to qualify for a 50% tax reduction for 36 months. The bill sets annual refund limits of $15 million for recovery projects and $10 million for recycled water exemptions, requiring producers to apply for refunds through the Tax Commission.
HB 2142 requires wind energy facility owners to ensure new construction or modifications do not harm military operations near installations. It mandates that owners submit FAA applications to the Oklahoma Military Department within 30 days and obtain a "determination of no hazard" from the FAA or resolve military impacts via the federal Clearinghouse. The bill prohibits projects that could interfere with military training routes, drop zones, runways, or defense airspace, with owners facing $1,500 daily fines for non-compliance. Confidential documentation shared with the Military Department cannot be disclosed publicly under Oklahoma law.
SB 460 establishes natural gas as the preferred fuel source for new fossil fuel electricity generation facilities in Oklahoma, requiring all new plants built after July 1, 2025, to use natural gas unless a generator can demonstrate to regulators that another fossil fuel better serves consumers. The bill amends Oklahoma law to create a "natural gas energy standard" that supplements renewable energy goals, specifically targeting new construction and added capacity at existing fossil fuel plants. This policy directly affects electricity generators planning new facilities or expansions, shifting the default fuel choice from other fossil fuels to natural gas. The law takes effect July 1, 2025, and was enacted as an emergency measure.
HB 2751 proposes setback requirements for wind energy towers in Oklahoma counties with specific population density (>8.5 people/sq mile) or low wind speed (<9.5 mph). It requires towers to be placed at least 2.5 times their tip height or 1/4 mile from nearby properties, whichever is greater, and allows counties to vote to waive this requirement via referendum every five years. The Oklahoma Corporation Commission must maintain a public database tracking which counties have active setback rules. The bill failed in the Energy Committee on April 24, 2025, and remains pending. This would directly affect property owners and wind energy developers in designated counties.
SB 352 prohibits utility companies from using eminent domain to build wind turbines, solar facilities, battery storage, or hydrogen gas facilities on private property. It also requires electricity providers to obtain a Corporation Commission certificate before using eminent domain for high-voltage transmission lines (over 300 kV). The bill directly affects utility companies seeking to expand infrastructure and private property owners whose land might be targeted for such projects. These changes amend Oklahoma’s eminent domain law (27 O.S. §7) to restrict certain facility siting and add oversight for major transmission projects. The bill was introduced in the 2025 Oklahoma Legislature and referred to the Energy and Natural Resources Oversight committee.
SB 1003 requires Oklahoma's Corporation Commission to create rules ensuring electricity grid affordability and reliability. It mandates that the grid maintain 115% guaranteed power capacity (sufficient backup power) to prevent outages, requires new wind/solar projects to include backup power costs in their total expense calculations, and directs the Commission to select new power sources based on the lowest total cost to ratepayers. These rules directly affect electric utilities and the Corporation Commission, with specific requirements including preventing premature retirement of existing power plants unless cost-effective and ensuring power sources meet continuous operating needs during extreme weather. The bill aims to prevent power shortages through measurable reliability standards, effective November 1, 2025.
SB 714 prohibits Oklahoma state retirement systems from using public funds to boycott energy companies (defined as actions penalizing fossil fuel companies without a financial reason) or divesting based on environmental, social, or political concerns. It transfers enforcement authority from the State Treasurer to the Attorney General and requires retirement systems to report any exemptions from the law. The bill shields state officials, employees, and contractors from lawsuits or financial liability when complying with its provisions, including claims of fiduciary duty breaches. It directly affects all Oklahoma state retirement systems and their investment decisions regarding energy companies.