Issue · Energy

Energy (Transmission)

Every energy bill, vote, and legislator stance in New Jersey, automatically classified by Maddy, our AI policy reader.

Total bills
21
2026-2027 Regular Session
Top supporter
-
no data yet
Top opponent
-
no data yet
Ranked legislators
0
0 support · 0 oppose
Showing 11–20 of 21 bills

All energy bills

in committee · New Jersey · Senate Feb 24, 2026

S 3639: Requires BPU, DCA, and DEP to establish expedited approval and permitting procedures for artificial intelligence data centers powered by small modular nuclear reactors.

This bill requires New Jersey's Board of Public Utilities (BPU), Department of Community Affairs (DCA), and Department of Environmental Protection (DEP) to create streamlined permitting processes for AI data centers powered by on-site small modular reactors (SMRs) within 12 months. It mandates expedited approvals for site selection, construction plans, electrical interconnection, and environmental permits (including wetlands, coastal, and water protection acts). The law directly affects AI data center developers and SMR manufacturers seeking to build or retrofit facilities using SMRs (defined as 50-300 MWe reactors requiring U.S. Nuclear Regulatory Commission licensing). The policy change focuses on accelerating project timelines without altering safety or environmental standards.
in committee · New Jersey · General Assembly Jan 13, 2026

A 3679: Creates temporary grant program for electric vehicle fire suppression technology.

This bill creates a one-year pilot program to help New Jersey fire departments test new technology for fighting electric vehicle fires. The Division of Fire Safety will award $5,000 grants to county fire marshals or code enforcers (where no marshal exists) to purchase and test emerging fire suppression equipment. Grantees must submit annual reports detailing the technology used, its effectiveness, and whether additional equipment would benefit their department. The program is funded by up to $115,000 from the Universal Service Fund, with $10,000 reserved for program administration. It expires one year after enactment, aiming to address documented challenges in extinguishing high-voltage battery fires.
in committee · New Jersey · General Assembly Jan 13, 2026

A 1059: Requires electric public utilities to submit to BPU and implement electric infrastructure improvement plans.

This bill requires New Jersey's electric public utilities to submit detailed infrastructure improvement plans to the Board of Public Utilities (BPU) within 120 days. The plans must address reopening closed or restricted electric distribution circuits - currently limiting renewable energy installations - to allow more solar and storage projects, using smart inverter technology to manage electricity flow. Utilities must also report on new renewable interconnection approvals and complete required work as soon as possible. The BPU will review and approve these plans within 300 days, focusing on expanding access to distributed renewable energy systems.
in committee · New Jersey · General Assembly Mar 16, 2026

A 3967: Requires BPU to work with neighboring states to research and recommend certain action concerning electric capacity and transmission.

This bill requires New Jersey's Board of Public Utilities (BPU) to collaborate with neighboring states to research alternatives to PJM Interconnection's capacity market system, which has caused record-high electricity costs for consumers. It directs the BPU to evaluate three specific options: requiring electric utilities to secure 80% of their future capacity through long-term contracts, withdrawing from PJM's market to create a new multi-state compact, or leaving PJM's transmission grid entirely. The BPU must submit a report by December 2025 with findings and recommendations, addressing concerns that PJM's current system has led to $14.7 billion in projected consumer costs for 2025/2026 - up from $2.2 billion previously. The bill directly affects New Jersey ratepayers and electric utilities by seeking to reduce electricity costs through regional grid policy changes.
passed both · New Jersey · Senate Jun 30, 2026

S 3183: Modifies various provisions of State's renewable energy incentive programs; requires electric public utilities to consider interconnection applications for certain solar projects.*

This bill modifies New Jersey's renewable energy incentive programs to support solar development on specific sites. It allows multiple solar projects to co-locate on the same or adjacent properties (without size limits) for community solar and remote net metering programs, and removes size restrictions for solar projects on landfills, brownfields, contaminated sites, or mining sites. Electric utilities must process interconnection applications for community solar or remote net metering projects on 34.5kV or lower voltage lines. Projects on designated sites must achieve commercial operation within 33 months (automatically extended for utility-caused delays), with the timeline starting from program registration.
in committee · New Jersey · Senate Feb 12, 2026

S 2189: Requires BPU to study potential deployment of advanced transmission technologies in NJ.

S 2189 (New Jersey Senate Bill 2189) requires the New Jersey Board of Public Utilities (BPU) to study the potential deployment of advanced transmission technologies, such as high-performance conductors, power flow control systems, and grid-enhancing software. The study will evaluate how these technologies could reduce grid congestion, increase transmission capacity, and improve reliability for electric utilities serving New Jersey consumers. The BPU must analyze specific benefits including cost savings, faster deployment timelines (3 months to 3 years versus 10 years for traditional infrastructure), and how these technologies address existing grid bottlenecks. This is a procedural study bill with no immediate policy changes; it mandates analysis to inform future decisions about grid modernization.
passed · New Jersey · Senate Mar 23, 2026

SR 18: Urges states in PJM Interconnection region to require data centers to obtain electricity from new zero- or low-emission sources of energy.

SR 18 is a non-binding Senate resolution urging states within the PJM Interconnection region (including New Jersey and 12 other states plus D.C.) to require data centers to source electricity from new zero- or low-emission energy sources. It does not create new regulations but calls on state governments to adopt policies addressing data centers' growing energy demands, which currently consume about 4% of U.S. electricity and are projected to reach 9% by 2030. The resolution cites concerns about grid strain, noting data centers use 10-50x more energy than typical offices and could double demand by 2030. It emphasizes clean energy sources like solar and wind as scalable solutions to support grid reliability and climate goals.
in committee · New Jersey · Senate Jan 13, 2026

S 674: Requires electric public utilities to upgrade certain portions of electric transmission and distribution system with advanced conductors.

S 674 requires New Jersey's electric utilities to upgrade portions of their transmission and distribution systems with "advanced conductors" during routine maintenance or dedicated projects, where practical. These conductors reduce energy loss by at least 10% compared to standard wires by using more efficient designs (like carbon fiber cores). Utilities must assess their systems within one year of the law's effective date and propose specific upgrade locations to the Board of Public Utilities. They may also request approval to recover the costs of these upgrades through customer electricity bills.
passed both · New Jersey · Senate Jun 30, 2026

S 2368: "Garden State Balcony Solar Act"; exempts portable solar generation devices from certain requirements, and requires certain entities to allow use and installation of portable solar generation devices.**

This bill exempts small portable solar devices (under 1,200 watts) from standard utility requirements. It directly affects homeowners using these devices, which connect via standard 120V outlets and meet electrical safety standards. Key provisions remove the need for interconnection agreements, net metering program rules, utility approval, or fees. Utilities cannot charge for these devices or require additional equipment beyond what’s built-in. The bill also shields utilities from liability for customer use of these devices.
in committee · New Jersey · Senate Jan 13, 2026

S 668: Requires electric public utilities to submit to BPU and implement electric infrastructure improvement plans.

This bill requires New Jersey's electric utilities to create and submit to the Board of Public Utilities (BPU) detailed plans within 120 days of enactment. The plans must address reopening electric distribution circuits currently closed or restricted (to ≤100 kW) for new renewable energy projects like solar panels and battery storage. Key provisions include requiring smart inverters that manage reactive power, enabling electricity flow between distribution and transmission systems, and identifying cost-effective alternatives to upgrade infrastructure. Utilities must report on interconnection approvals for renewable projects after implementing their plans, with the BPU reviewing and approving plans within 300 days. The bill directly affects utilities and renewable energy developers by removing grid access barriers.
Showing 11 to 20 of 21 bills