Issue · Energy

Energy

Every energy bill, vote, and legislator stance in New Jersey, automatically classified by Maddy, our AI policy reader.

Total bills
28
2026-2027 Regular Session
Top supporter
Linda Greenstein
100% support rate
Top opponent
Parker Space
0% support rate
Ranked legislators
10
5 support · 5 oppose
Key legislators

Who's moving energy in New Jersey

Legislators moving energy in New Jersey
Legislator Party Stance Support rate Decisive votes
Linda Greenstein
Linda Greenstein Senate · District 14
D
Strong +
100% 28
John McKeon
John McKeon Senate · District 27
D
Strong +
100% 25
Bob Smith
Bob Smith Senate · District 17
D
Strong +
100% 24
Bill Spearman
Bill Spearman House · District 5
D
Strong +
100% 23
Robert Karabinchak
Robert Karabinchak House · District 18
D
Strong +
100% 23
Parker Space
Parker Space Senate · District 24
R
Strong −
0% 24
Gerry Scharfenberger
Gerry Scharfenberger House · District 13
R
Strong −
0% 19
Antwan McClellan
Antwan McClellan House · District 1
R
Strong −
0% 17
Kristin Corrado
Kristin Corrado Senate · District 40
R
Strong −
0% 16
Mike Inganamort
Mike Inganamort House · District 24
R
Strong −
0% 16
Showing 11–20 of 28 bills

All energy bills

in committee · New Jersey · General Assembly Jun 30, 2026

A 4530: Establishes certain electric vehicle supply equipment development processes and standards concerning public health and safety; removes certain existing approval requirements while preserving applicable safety and inspection standards.

This New Jersey bill streamlines the approval process for installing electric vehicle charging equipment at existing buildings and service stations by replacing complex land use reviews with a faster administrative permit system. The legislation requires installations to meet existing safety and construction codes but removes the need for site plan board reviews or variance relief for most applications. Local governments retain limited authority to deny permits only when there is clear, evidence-based proof that the equipment would harm public health or safety, excluding general planning concerns. The bill also sets a 20-day timeline for jurisdictions to notify applicants if their applications are incomplete and clarifies that charging stations encroaching on setbacks do not automatically violate safety standards.
in committee · New Jersey · General Assembly Jun 30, 2026

A 4836: "Garden State Balcony Solar Act"; exempts portable solar generation devices from certain requirements, and requires certain entities to allow use and installation of portable solar generation devices.*

This New Jersey bill exempts small, portable solar generators from standard utility rules like interconnection agreements and net metering programs. It specifically affects homeowners who want to use these devices, which are defined as having a maximum output of 1,200 watts and plugging into standard 120-volt outlets. Under the new law, utility companies cannot require approval, fees, or extra equipment for these devices, and they are also shielded from liability for any damage caused by their use. Additionally, the bill mandates that the Department of Community Affairs update building codes to provide clear guidelines for safely wiring homes to accommodate these portable power systems.
in committee · New Jersey · General Assembly Jun 30, 2026

A 2524: Permits dual-use solar energy projects to participate in community solar program.*

This bill amends New Jersey's community solar program to allow "dual-use" solar facilities - those combining solar panels with ongoing agricultural production on farmland - to participate. It sets a 5-megawatt maximum per project, requires at least two participating customers, and mandates access for low- and moderate-income residents. The law also establishes phased registration goals (225 MW by 2024, then 3,000 MW total by 2029) and requires monthly reporting on energy generation and bill credits. This directly affects electric utility customers in New Jersey who can now access community solar projects on farmland, with specific protections for low-income participants.
passed · New Jersey · General Assembly Jun 30, 2026

A 2403: Directs BPU to adopt rules and regulations incentivizing solar energy generation in roadside rights-of-way.*

This bill establishes a pilot program allowing solar energy projects on state and local government-owned roadside rights-of-way (land adjacent to roads, 30-100 feet from the road centerline) in New Jersey. Projects must not exceed 10 megawatts individually, with a total program cap of 200 megawatts, and must avoid disrupting traffic, safety, or road maintenance. The Board of Public Utilities, with input from the Transportation Commissioner, will review applications based on criteria like safety monitoring, environmental impact, and project size, requiring permits before construction. The pilot runs for 36 months, with possible two 12-month extensions (max 50 megawatts increase per extension) to evaluate outcomes.
passed · New Jersey · General Assembly Jun 30, 2026

A 1072: Direct BPU to establish certain incentive programs for energy storage and management.**

This bill requires New Jersey's Board of Public Utilities (BPU) and electric utilities to establish a program developing 500 megawatts of distributed battery storage capacity statewide by 2030. It mandates the BPU to set minimum program requirements, including specific storage targets per utility, size standards, and enhanced incentives for projects in overburdened communities and redevelopment areas. Electric utilities must submit implementation plans to the BPU for approval, with annual reporting to ensure compliance and cost savings for ratepayers. The program aims to improve grid stability, reduce interconnection times, and lower system costs by leveraging federal funding and avoiding distribution upgrades.
in committee · New Jersey · General Assembly Jun 30, 2026

A 4096: Requires data center owners and operators to submit semi-annual water and energy usage reports to BPU.

This bill requires data center owners and operators in New Jersey to submit semi-annual reports to the Board of Public Utilities (BPU) detailing their water and energy usage. The reports must include specific metrics like total energy consumption (including cooling), water sources, and efficiency calculations such as "water usage effectiveness" (water used per computing task) and "energy reuse factor" (heat reused outside the facility). Data centers that receive state financial incentives must also report additional sustainability metrics, including average cooling temperatures and renewable energy usage. The law applies to all data centers operating in the state, with initial reports due 3-6 months after the bill takes effect.
in committee · New Jersey · General Assembly Jun 30, 2026

A 3974: Modifies various provisions of State's renewable energy incentive programs; requires electric public utilities to consider interconnection applications for certain solar projects.*

This bill (A 3974) modifies New Jersey's renewable energy incentive programs to support solar development on specific land types. It allows multiple solar projects to co-locate on the same or adjacent properties without size restrictions, removes power output limits for projects on landfills, brownfields, contaminated sites, or mining sites, and requires projects on these sites to achieve commercial operation within 33 months (with automatic extensions for utility delays). Electric utilities must process interconnection applications for community solar and remote net metering projects within 90 days and complete interconnection within 30 days, facing $5,000 daily penalties for delays. These changes directly affect solar developers, utilities, and participants in New Jersey's community solar and remote net metering programs.
passed both · New Jersey · Senate Jun 30, 2026

S 3183: Modifies various provisions of State's renewable energy incentive programs; requires electric public utilities to consider interconnection applications for certain solar projects.*

This bill modifies New Jersey's renewable energy incentive programs to support solar development on specific sites. It allows multiple solar projects to co-locate on the same or adjacent properties (without size limits) for community solar and remote net metering programs, and removes size restrictions for solar projects on landfills, brownfields, contaminated sites, or mining sites. Electric utilities must process interconnection applications for community solar or remote net metering projects on 34.5kV or lower voltage lines. Projects on designated sites must achieve commercial operation within 33 months (automatically extended for utility-caused delays), with the timeline starting from program registration.
passed both · New Jersey · Senate Jun 30, 2026

S 2368: "Garden State Balcony Solar Act"; exempts portable solar generation devices from certain requirements, and requires certain entities to allow use and installation of portable solar generation devices.**

This bill exempts small portable solar devices (under 1,200 watts) from standard utility requirements. It directly affects homeowners using these devices, which connect via standard 120V outlets and meet electrical safety standards. Key provisions remove the need for interconnection agreements, net metering program rules, utility approval, or fees. Utilities cannot charge for these devices or require additional equipment beyond what’s built-in. The bill also shields utilities from liability for customer use of these devices.
in committee · New Jersey · General Assembly Jun 4, 2026

A 3980: "Powering Up New Jersey Act"; establishes requirements for certain public utility infrastructure investments.*

This bill requires New Jersey's electric public utilities (like PSE&G and Jersey Central Power) to create and submit detailed grid modernization plans within one year of the law's effective date. The plans must include specific projects to modernize the electricity distribution system, such as integrating energy storage, improving storm resilience, supporting renewable energy connections, and aligning with state greenhouse gas goals. The Board of Public Utilities reviews and approves these plans within 240 days, and utilities must implement approved plans within 90 days. To offset potential rate increases for customers, the bill establishes a new "Grid Modernization Ratepayer Relief Fund" to provide grants, prioritizing projects funded by federal infrastructure acts.
Showing 11 to 20 of 28 bills