Key legislators
Who's moving environment in Maryland
Showing 3 of 3
bills
All environment bills
HB 395 repeals a requirement that new Concentrated Animal Feeding Operations (CAFOs) must obtain a general discharge permit from Maryland's Department of the Environment before beginning construction. This directly affects developers and operators planning new CAFO facilities by removing a pre-construction permitting step. The bill modifies Maryland's Environment Article by deleting Section 9-323(a)(2), which previously mandated this permit for new CAFO construction. The change only applies to the construction phase, not to operating permits or existing CAFOs.
This bill removes a requirement that livestock operations must obtain a water pollution permit from Maryland's Department of the Environment before beginning construction on new facilities. It directly affects new concentrated animal feeding operations (CAFOs) in Maryland by eliminating the pre-construction permit step. The change means CAFO operators can start building without first securing a permit, though permits remain required for operating the facilities after construction is complete. The bill does not alter existing permit requirements for operational discharges.
HB 1621 requires wastewater treatment plants processing over 50 million gallons of effluent daily to monitor discharges for hormones, PFAS chemicals, and bacteria, and publicly post daily bacterial levels and incident reports (like overflows) on their websites within 24 hours. It establishes bacterial safety thresholds requiring immediate public alerts when exceeded and bars non-compliant plants from Maryland's Water Quality Trading Program. Smaller plants (under 50 million gallons daily) must report staffing plans annually instead of daily data. The bill mandates transparency through public websites and gives the Department authority to enforce these requirements.