Requires an initial in-person examination to establish a veterinarian-client-patient relationship beginning July 1, 2026. Provides an exception for veterinarian-client-patient relationships established on or before June 30, 2026.
Rep. Mike Aylesworth
Sponsored bills
Requires IDEM to: (1) perform a comprehensive evaluation of ambient air quality within nonattainment areas in Indiana; and (2) identify air pollution reduction or regulatory relief strategies that could accomplish certain goals with respect to the federal Clean Air Act.
Provides a credit against state tax liability for expenses incurred in the manufacture of a small modular nuclear reactor (SMR) in Indiana. Establishes procedures under which certain energy utilities may request approval for one or more of the following from the Indiana utility regulatory commission (IURC): (1) An expedited generation resource plan (EGR plan) to meet customer load growth that exceeds a specified threshold. (2) A generation resource submittal for the acquisition of a specific generation resource in accordance with an approved EGR plan. (3) A project to serve one or more large load customers. Sets forth: (1) the requirements for approval of each of these types of requests; (2) standards for financial assurances by large load customers; and (3) cost recovery mechanisms for certain acquisition costs or project costs incurred by energy utilities. Amends the statute concerning public utilities' annual electric resource planning reports to the IURC to provide that for an annual report submitted after December 31, 2025, a public utility must include information as to the amount of generating resource capacity or energy that the public utility plans to retire or refuel with respect to any electric generation resource of at least 125 megawatts. Provides that for any planned retirement or refueling, the public utility must include, along with other specified information, information as to the public utility's plans with respect to the following: (1) For a retirement, the amount of replacement capacity identified to provide approximately the same accredited capacity within the appropriate regional transmission organization (RTO) as the capacity of the facility to be retired. (2) For a refueling, the extent to which the refueling will maintain or increase the current generating resource accredited capacity or energy that the electric generating facility provides, so as to provide approximately the same accredited capacity within the appropriate RTO. Requires IURC staff to prepare a staff report for each public utility report that includes a planned electric generation resource retirement. Provides that if, after reviewing a public utility's report and any related staff report, the IURC is not satisfied that the public utility can satisfy both its planning reserve margin requirement and the statute's prescribed reliability adequacy metrics, the IURC shall conduct an investigation into the reasons for the public utility's inability to meet these requirements. Provides that if the public utility's report indicates that the public utility plans to retire an electric generating facility within one year of the date of the report, the IURC must conduct such an investigation. Provides that: (1) a public utility may request, not earlier than three years before the planned retirement date of an electric generation facility, that the IURC conduct an investigation into the planned retirement; and (2) if the IURC conducts an investigation at the request of the public utility within that three year period, the IURC may not conduct a subsequent investigation that would otherwise be required under the bill's provisions unless the IURC is not satisfied that the public utility can satisfy both its planning reserve margin requirement and the statutory reliability adequacy metrics as of the time the investigation would otherwise be required. Provides that if a CPCN is granted by the IURC for a facility intended to repower or replace a generation unit that is planned for retirement, and the CPCN includes findings that the project will result in at least equivalent accredited capacity and will provide economic benefit to ratepayers as compared to the continued operation of the generating unit to be retired, the CPCN constitutes approval by the IURC for purposes of an investigation that would otherwise be required. Provides that if, after an investigation, the IURC determines that the capacity resources available to the public utility will not be adequate to allow the public utility to satisfy both its planning reserve margin requirements and the statute's prescribed reliability adequacy metrics, the IURC shall issue an order: (1) directing the public utility to acquire or construct; or (2) prohibiting the retirement or refueling of; such capacity resources that are reasonable and necessary to enable the public utility to meet these requirements. Provides that if the IURC does not issue an order in an investigation within 120 days after the initiation of the investigation, the public utility is considered to be able to satisfy both its planning reserve margin requirement and the statutory reliability adequacy metrics with respect to the retirement of the facility under investigation. Provides that if the IURC issues an order to prohibit the retirement or refueling of an electric generation resource, the IURC shall create a sub-docket to authorize the public utility to recover in rates the costs of the continued operation of the electric generation resource proposed to be retired or refueled, subject to a finding by the IURC that the continued costs of operation are just and reasonable. Makes a technical change to another Indiana Code section to recognize the redesignation of subsections within the section containing these provisions.
Provides that if a person changes the exterior color or appearance of their passenger vehicle from the color listed in the vehicle's registration through certain methods, the person must apply to amend their vehicle registration, and that a law enforcement officer shall issue a warning to a person who does not update the person's registration to reflect the color changes. Provides that a person commits a Class C misdemeanor if the person changes the color of a passenger vehicle after it was used in the commission of a crime and fails to amend the vehicle registration. Requires the BMV to require a person renewing a registration to indicate if the vehicle's color has changed.
Requires the department of environmental management (department) to conduct an onsite inspection of a confined feeding operation (CFO) once within 45 days of an initial approval and once within 90 days of a renewal of an approval to verify compliance with certain requirements. Allows the department to conduct complaint based onsite inspections of a confined feeding operation at the department's discretion without providing notice. Provides that the department may delay an inspection of a CFO if the department determines that the additional time is needed to comply with the biosecurity procedures developed by the department. Provides that additional onsite inspections of a CFO may be conducted if there is a substantial need for the inspection. Provides that an onsite inspection of a CFO must be conducted in compliance with certain rules and procedures. Makes conforming amendments.
Defines "prescribed burn". Provides for the following: (1) Requirements to be met before a person conducts a prescribed burning. (2) That a certified prescribed burn manager and a completed prescribed burn plan must be present during a prescribed burning. (3) Certain civil liability immunities related to conducting a prescribed burn and the prescribed burn certification program. (4) Under certain conditions, exemption of prescribed burning from certain local regulations. (5) That a prescribed burning and the smoke produced by the prescribed burning do not constitute a nuisance. (6) That the division of forestry shall administer the training and certification program for prescribed burning. Limits damages for injuries or losses as result of a prescribed burn to actual damages.
Defines "revocation of a license". Creates a process in which the director of the Indiana grain buyers and warehouse licensing agency (agency) determines whether a building or other protected enclosure constitutes a single warehouse that requires one or more licenses. Specifies the documents a person who desires to conduct business as a grain buyer, warehouse operator, or buyer-warehouse (licensee) must submit to the agency to renew a license to operate. Specifies how a business as a licensee may renew its license. Specifies the types of licenses the agency shall issue and how a license may be relinquished. Establishes what information must be included in a financial statement submitted by a licensee to the agency. Removes the ability of the agency to temporarily suspend a licensee's license. Specifies various matters related to on-premises inspections. Permits the director of the agency (director) to call an informal meeting with a licensee. Provides when the director may revoke, and when the director shall revoke, a licensee's license and what information the director must share with the licensee. Establishes various notice requirements. Permits the agency to adopt rules. Requires the director to inspect and test all equipment used to test the moisture content of grain purchased from producers once per year. Requires the Indiana grain indemnity corporation board to elect a chairperson and vice chairperson and take on various new responsibilities. Addresses various issues with producer premiums. Provides that a grain buyer shall keep accurate and correct records of grain purchased from producers documenting the producer premiums paid by producers. Establishes storage fees to determine storage loss. Requires the office of the attorney general to provide legal assistance if requested by the director. Requires the director to take possession of the bond or other security and all proceeds from a grain sale in the event a licensee has failed to meet its obligations under the grain indemnity chapter. Provides that the director shall provide informal conferences between agency representatives and persons who have or who appear to have grain deposited with the licensee in revocation. Makes technical and conforming changes.
Alters the membership of a watershed development commission board that includes the Maumee River basin (Maumee watershed development commission). Provides that a Maumee watershed development commission may take certain actions with respect to certain flood plains. Expands permitted uses for certain funds collected by a Maumee watershed development commission and establishes certain budget limits. Provides that the department of natural resources's division of water shall provide a Maumee watershed development commission with a written summary of the division's review of certain public works projects within 30 days of the review. Makes conforming changes.
Amends the eligibility requirements for service as a member on all county property tax assessment boards of appeal (PTABOA) to provide that any member appointed to the PTABOA must be a resident of Indiana for the entirety of the member's term. Provides that the term of an individual serving as a member on a PTABOA on June 30, 2025, who is not a resident of Indiana, expires July 1, 2025. Requires the appropriate county appointing authority to appoint the individual's successor.
Allows the horse racing commission (commission) to issue a license for certain individuals to provide teeth floating on a licensed horse race track in Indiana. Provides an exception to the licensing and special permits requirements of veterinary medicine for certain individuals who are licensed by the commission.