Existing law establishes the Transportation Agency, which has the power of general supervision over specified state entities. Existing law requires the agency to develop and report on legislative, budgetary, and administrative programs to accomplish comprehensive, long-range, coordinated planning and policy formation in the matters of public interest related to the agency. This bill would establish specified goals for the Climate Action Plan for Transportation Infrastructure (CAPTI) , consistent with state law.
Existing law establishes the Department of Housing and Community Development in the Business, Consumer Services, and Housing Agency. Existing law, the California Building Standards Law, establishes the California Building Standards Commission. Existing law requires the commission to approve and adopt building standards and to codify those standards in the California Building Standards Code. Existing law, the State Housing Law, establishes statewide construction and occupancy standards for buildings used for human habitation. Existing law, until January 1, 2033, requires the commission and the department, commencing with the next triennial edition of the code adopted after January 1, 2023, to research and develop, and authorizes the commission and the department to propose for adoption by the commission, mandatory building standards for the installation of electric vehicle charging stations in existing multifamily dwellings, hotels, motels, and nonresidential developments, as specified. This bill would authorize the commission, commencing with the first triennial edition of the code adopted after June 1, 2031, to adopt, approve, codify, and publish building energy standards for building electrical circuit features to enable a qualified plug-in photovoltaic system, as defined, to function as an energy source within the electrical circuit of a single-family residential dwelling, multiunit residential dwelling, or nonresidential development, that is constructed after that edition is adopted, as specified. The bill would, for purposes of that requirement, require the department to research, develop, and propose for adoption building standards for a qualified plug-in photovoltaic system to function as an energy source within the electrical circuit of a single-family residential dwelling, multiunit residential dwelling, or nonresidential development, as specified. The bill would require the commission and the department, in satisfying those requirements, to, among other things, consult with certain interested parties and invite the participation of the public at large in the development of those building energy standards through open consensus-based processes.
Existing law establishes the Natural Resources Agency, composed of departments, boards, conservancies, and commissions responsible for the restoration, protection, and management of the state's natural and cultural resources. This bill would authorize the Secretary of the Natural Resources Agency to appoint an individual or to identify one or more University of California centers to oversee and administer a Secretariat for International Climate Coordination and Cooperation to assist the legislative and executive branches' engagement in international climate policy, as specified.
Existing law, the California Clean Energy Jobs Act, expresses a goal of creating good-paying energy efficiency and clean energy jobs in California. Existing law establishes in state government the Labor and Workforce Development Agency, under the supervision of the Secretary of Labor and Workforce Development, which consists of the Office of the Secretary of Labor and Workforce Development and the California Workforce Development Board, among others. Existing law creates the position of Deputy Secretary for Climate within the agency, subject to appropriation by the Legislature, for the purpose of assisting in the oversight of California's workforce transition to a sustainable and equitable carbon neutral economy. This bill would, upon appropriation by the Legislature, establish an Electric Vehicle Economic Opportunity Zone (EVEOZ) for the County of Riverside, administered by the Labor and Workforce Development Agency, for the purpose of creating programs to make electric vehicle manufacturing jobs and education more accessible to lower income communities. The bill would require the agency to collaborate with the County of Riverside in determining the geographical boundaries of the EVEOZ. By imposing additional duties on local officials, the bill would impose a state-mandated local program. The bill would authorize the agency to partner with educational institutions, electric vehicle manufacturing businesses, and local and national financial intuitions to develop EVEOZ education, training, and investment programs, as specified. This bill would make legislative findings and declarations as to the necessity of a special statute for the County of Riverside. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC, in consultation with the State Energy Resources Conservation and Development Commission and the Independent System Operator, to take specified actions to facilitate the commercialization of microgrids for distribution customers of large electrical corporations, including developing microgrid service standards necessary to meet state and local permitting requirements and developing methods to reduce barriers for microgrid deployment without shifting costs between ratepayers. This bill would require a large electrical corporation, upon request, to collaborate with local governments, tribal governments, or community choice aggregators within its service area to support resiliency planning, as provided. The bill would require large electrical corporations to provide local governments, tribal governments, and community choice aggregators with access to data, including electrical distribution equipment data, transmission and distribution circuit data, grid hardening plans, and other information as directed by the commission, to support resiliency planning by local governments and tribal governments to ensure local governments, tribal governments, and community choice aggregators are able to plan potential microgrid projects to support critical facilities. The bill would authorize the commission to require large electrical corporations to share this information in aggregated and anonymized form to protect customer privacy and electrical grid security. Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the PUC is a crime. Because the violation of a PUC action implementing the bill's requirements would be a crime, this bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
This measure would urge President Donald J. Trump and Congress to protect and maintain the historic investments made possible by the Bipartisan Infrastructure Law, the CHIPS and Science Act, and the Inflation Reduction Act of 2022.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law requires each electrical corporation, local publicly owned electric utility, or electrical cooperative, or any other entity that offers electrical service, except as provided, to develop a standard contract or tariff providing for net energy metering, and to make this standard contract or tariff available to eligible customer-generators using renewable electrical generation facilities, as specified. Pursuant to its authority, the commission issued a decision revising net energy metering tariff and subtariffs, commonly known as the net billing tariff. Existing law authorizes an eligible customer-generator with multiple meters to aggregate the electrical load of the meters located on the property where the renewable electrical generation facility is located and on all property adjacent or contiguous to the property on which the renewable electrical generation facility is located, if those properties are solely owned, leased, or rented by the eligible customer-generator, as provided. This bill would require the commission, for purposes of certain net energy metering contracts or tariffs, to ensure that logistics businesses and manufacturing businesses are eligible customer-generators for purposes of aggregating multiple meters, as described above, if the commission extends the application of that provision. Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime. Because a violation of a commission action implementing this bill's requirements would be a crime, the bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the California Renewables Portfolio Standard Program requires retail sellers and local publicly owned electric utilities to procure a minimum quantity of electricity products from eligible renewable energy resources during certain compliance periods up to December 31, 2030. Existing law provides that a local publicly owned electric utility is not required to procure a certain amount of eligible renewable energy resources if, during a year within those compliance periods, the local publicly owned electric utility receives more than 40% of its retail sales from large hydroelectric generation under an ownership agreement or contract in effect as of January 1, 2018. Existing law authorizes the State Energy Resources Conservation and Development Commission (Energy Commission) to establish appropriate multiyear compliance periods for local publicly owned electric utilities beyond December 31, 2030. This bill would provide that the provision related to the procurement of eligible renewable energy resources by local publicly owned electric utilities also applies to the compliance periods established by the Energy Commission.
Existing law defines a "renewable electrical generation facility" as a facility that uses biomass, solar thermal, photovoltaic, wind, geothermal, fuel cells or linear generators that use specified fuels, small hydroelectric generation of 30 megawatts or less, digester gas, municipal solid waste conversion, landfill gas, ocean wave, ocean thermal, or tidal current, and that meets other specified requirements. Existing law incorporates that definition into various programs, including the California Renewables Portfolio Standard Program, which requires the Public Utilities Commission to establish a renewables portfolio standard requiring all retail sellers, as defined, to procure a minimum quantity of electricity products from electrical generating facilities that meet that definition of "renewable electrical generation facility," and the net energy metering program, in which residential customers, small commercial customers, and commercial, industrial, or agricultural customers of an electrical utility, who use renewable electrical generation facilities, are eligible to participate, as specified. This bill would expand the definition of "renewable electrical generation facility" to include a facility that converts hydrogen gas to electricity in a turbine and meets specified criteria, including that the hydrogen used in the turbine is solely derived from an eligible renewable resource, as specified, or through the electrolysis of water, and exclusively uses electricity generated from another renewable electrical generation facility, and that the manufacturing of the hydrogen does not result in resource shuffling or use unbundled renewable energy credits, as specified. Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime. Because a violation of a commission action implementing this bill's requirements would be a crime, the bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason. This bill would declare that it is to take effect immediately as an urgency statute.
(1) Existing law authorizes the State Oil and Gas Supervisor to authorize the conversion of not more than 250 wells for use as gravity-based energy storage wells to evaluate their use, including the establishment of appropriate operating conditions and physical parameters to safely store and generate energy. Existing law repeals this authorization on January 1, 2035, and would specify that authorizations issued by the supervisor terminate on that date. This bill would correct an erroneous cross reference for that authorization. (2) Existing law defines "task force" as the Wildfire and Forest Resilience Task Force established by the Governor to oversee the implementation of Executive Order No. B-52-18, and required the task force to, among other things, on January 1, 2022, develop a comprehensive implementation strategy to track and ensure the achievement of the goals and key actions identified in "California's Wildfire and Forest Resilience Action Plan" issued by the task force in January 2021, as provided. This bill would make nonsubstantive changes to the definition of "task force." (3) Existing law requires the State Lands Commission to adopt regulations relating to ballast water, as provided. Existing law requires the commission to adopt a regulation that requires an owner or operator of a vessel carrying, or capable of carrying, ballast water that operates on the waters of the state to comply with specified federal laws, as provided. Existing law requires the commission to consult with the United States Coast Guard to attempt to identify an alternative, environmentally sound method of ballast water management under specified circumstances in accordance with specified federal laws, as provided. This bill would require the commission to adopt a regulation that requires an owner or operator of a vessel carrying, or capable of carrying, ballast water that operates on the waters of the state to instead comply with different specified federal law. The bill would also require the commission to consult with the United States Coast Guard on an alternative, environmentally sound method of ballast water management under specified circumstances in accordance with additional federal law. (4) Existing law lifts, until February 1, 2066, the use restrictions imposed by the granting statutes and the public trust doctrine with respect to after-acquired lands, property that is not original tidelands or submerged lands, title to which was not derived from the granting statutes, that were acquired with public trust funds derived from port operations as specified, in Jack London Square and authorizes the Port of Oakland to lease these lands for any purpose subject to specified conditions. Existing law authorizes the port to lease after-acquired lands for a nontrust use only if the port finds specified conditions are met, including, among other conditions, that the nontrust uses will not impair or harm existing public access or public trust uses and are intended to attract the statewide public to Jack London Square and the waterfront to promote increased use and enjoyment of the area. Existing law requires the port to make the findings that these specified conditions are met for each proposed nontrust lease at a public meeting. This bill would correct an erroneous cross-reference relating to that requirement.