Water and water rights; prohibiting certain groundwater use; authorizing certain groundwater permit; removing certain meter use requirement; authorizing certain allocation; developing certain voluntary groundwater use measurement program; requiring certain certification; clarifying certain application. Effective date.
SB 1928 modifies Oklahoma's water rights law by removing mandatory metering requirements for most wells while introducing a new five-year flexible groundwater allocation system. It applies to existing and new groundwater permit holders in designated basins, requiring annual usage reports and fees to maintain their allocation. The bill allows permit holders to temporarily exceed their annual usage limit by up to 200% in any single year, as long as their total usage over five years stays within the basin's overall limit. Domestic wells are explicitly excluded from these provisions. The changes take effect January 1, 2027.
Bill status
passed
3 of 5 stages cleared
Introduction
Feb 2026
Committee Review
Apr 2026
Senate Passage
Mar 2026
House Passage
Governor
Introduced Feb 2, 2026
Last action Apr 14, 2026
Maddy AI version diff · 5 comparisons
What changed between versions
Floor (House)
→
Floor (Senate)
·
5 edits
MODERATE
The bill was amended to shift its focus from general groundwater waste prevention to specific conservation measures for large water users. The Senate version adds a new 'flex allocation' program allowing permit holders to exceed annual limits in exchange for a five-year cumulative cap, and it mandates a voluntary groundwater measurement program for irrigation districts and conservation districts.
Scope change
The scope narrowed from a broad prohibition on groundwater waste to a targeted conservation program for specific types of permit holders (irrigation and conservation districts) and large data center facilities.
REQUIREMENT
Added a requirement for irrigation and conservation districts to develop a voluntary groundwater measurement program to verify water usage.
Added a 'flex allocation' provision allowing permit holders to exceed annual water limits in any single year, provided the total usage over five years does not exceed the basin's total allocation.
ELIGIBILITY
Modified the cooling system requirements to specifically target data processing facilities, requiring closed-loop or low-consumptive technology for new permits.
TIMELINE
Changed the effective date for the conservation flex allocation program from January 1, 2027, to November 1, 2026.
ENFORCEMENT
Removed the provision allowing the Board to determine waste based on pollution activities regulated by other state environmental agencies.
Floor votes · Senate Mar 25, 2026
How they voted
48–0
Passed · 2 other
Total votes 50
Mar 25, 2026
D
Democratic9
100% Yea
R
Republican41
95% Yea
Vote distribution
All Yea
All Nay
Mixed
No data
Full legislative history
Actions timeline
Total actions
20
Key actions
5
Committee
5
Amendments
1
Apr 14, 2026
Lower · Passed
CR; Do Pass, amended by committee substitute Energy and Natural Resources Oversight Committee
lower
Apr 6, 2026
Lower · Passed
Policy recommendation to the Energy and Natural Resources Oversight committee; Do Pass Agriculture
lower
Mar 30, 2026
Committee
Referred to Agriculture
lower
Mar 26, 2026
Introduced
First Reading
lower
Mar 26, 2026
Upper · Passed
Engrossed to House
upper
Mar 25, 2026
Committee
Referred for engrossment
upper
Mar 25, 2026
Upper · Passed
Measure passed: Ayes: 36 Nays: 9
upper
Mar 25, 2026
Introduced
General Order, Amended
upper
Mar 5, 2026
Upper · Passed
Reported Do Pass, amended by committee substitute Energy committee; CR filed
upper
Feb 2, 2026
Introduced
First Reading
upper
2 primary · 0 co-sponsors
Sponsors
Ask Maddy
·
AI policy assistant
Ask Maddy about SB 1928
Scope: OK
Hi! I can help you understand SB 1928. What would you like to know?
Try one of these
i
Maddy answers using official bill text and legislative records. Always verify before sharing.
Sources cited inline