Issue · Energy

Energy (Transmission)

Every energy bill, vote, and legislator stance in New York, automatically classified by Maddy, our AI policy reader.

Total bills
22
2025 Regular Session
Top supporter
Michelle Hinchey
100% support rate
Top opponent
Mark Walczyk
0% support rate
Ranked legislators
10
5 support · 5 oppose
Key legislators

Who's moving transmission in New York

Legislators moving transmission in New York
Legislator Party Stance Support rate Votes
Michelle Hinchey
Michelle Hinchey Senate · District 41
D
Strong +
100% 14
Brian Kavanagh
Brian Kavanagh Senate · District 27
D
Strong +
100% 13
Kevin Parker
Kevin Parker Senate · District 21
D
Strong +
100% 13
Rachel May
Rachel May Senate · District 48
D
Strong +
100% 13
Chris Ryan
Chris Ryan Senate · District 50
D
Strong +
100% 12
Mark Walczyk
Mark Walczyk Senate · District 49
R
Strong −
0% 12
Dan Stec
Dan Stec Senate · District 45
R
Strong −
0% 10
Peter Oberacker
Peter Oberacker Senate · District 51
R
Strong −
0% 7
George Borrello
George Borrello Senate · District 57
R
Strong −
11% 9
Rob Ortt
Rob Ortt Senate · District 62
R
Strong −
11% 9
Showing 11–20 of 22 bills

All energy bills

passed · New York · Senate Jun 5, 2026

S 4408: Relates to agreements and easements related to renewable energy interconnection across reforestation areas

S 4408 allows New York's state environmental department to create leases or easements for renewable energy projects (like solar and wind farms) on state-owned lands designated for reforestation. These agreements must not interfere with the reforestation purposes of the land, as defined by New York's constitution. The bill requires all such agreements to be publicly recorded and posted online. It directly affects the state department, renewable energy developers, and the management of reforestation areas.
in committee · New York · Senate Jan 7, 2026

S 5834: Relates to standard utility interconnection of sub-transmission lines for particular projects

This bill allows renewable energy projects (like solar or wind farms) to connect directly to higher-voltage utility transmission lines (sub-transmission level) instead of only lower-voltage distribution lines. It applies to projects already classified as "distributed generation" under existing state rules, provided they meet all state and federal requirements. The interconnection process must follow the same procedures used for standard transmission-level connections. This change simplifies grid access for renewable projects, directly affecting energy developers and utility companies managing grid connections.
passed both · New York · Assembly May 6, 2026

A 4127: Authorizes and directs the department of public service to conduct a study on the deployment of energy interconnection processes into the electrical grid

Authorizes and directs the department of public service to conduct a study on the deployment of energy interconnection processes into the electrical grid to meet the state's renewable energy goals; directs the department of public service to submit a report on its findings one year after the effective date.
in committee · New York · Senate May 6, 2026

S 1227: Authorizes and directs the department of public service to conduct a study on the deployment of energy interconnection processes into the electrical grid

Authorizes and directs the department of public service to conduct a study on the deployment of energy interconnection processes into the electrical grid to meet the state's renewable energy goals; directs the department of public service to submit a report on its findings one year after the effective date.
in committee · New York · Senate Jan 7, 2026

S 97: Enacts the "build to need act"

Enacts the "build to need act" to meet the state's electrification and climate related policy mandates; directs the public service commission to implement a grid planning process; makes related provisions.
in committee · New York · Assembly Jan 7, 2026

A 7728: Relates to standard utility interconnection of sub-transmission lines for particular projects

This bill (A 7728) allows renewable energy projects (like solar or wind farms) to connect directly to utility distribution systems at the sub-transmission level, rather than only at lower voltage levels. It requires these projects to meet all existing state and federal requirements, but streamlines the interconnection process to match the standard method used for higher-voltage transmission connections. This change directly affects renewable energy developers and utilities by making it easier for certain projects to connect to the grid, potentially reducing costs and delays for qualifying distributed generation. The bill amends the energy law to override conflicting rules, effective immediately upon passage.
passed · New York · Senate Jun 1, 2026

S 2708: Relates to advanced transmission technologies

Directs electric corporations and combination electric and gas corporations to file a cost-effectiveness and timetable analysis as part of any base rate proceeding with the public service commission; directs NYSERDA to conduct a study on the effectiveness of advanced transmission technologies.
passed both · New York · Assembly May 28, 2026

A 9111: Relates to portable solar generation devices

This bill defines "portable solar generation devices" (moveable solar panels connecting via standard outlets, max 1,200 watts, certified by labs) and exempts them from utility interconnection and net metering requirements. It directly affects residential customers using these small solar devices and electric utilities. Key provisions prevent utilities from requiring approval, charging fees, or demanding extra equipment for these devices, while also shielding utilities from liability for device-related damage. The law takes immediate effect.
in committee · New York · Senate Jan 7, 2026

S 5506: Relates to qualified energy storage systems

Relates to qualified energy storage systems; authorizes energy storage permitting under the office of renewable energy siting and electric transmission.
passed · New York · Senate May 12, 2026

S 2485: Requires the office of renewable energy siting and electric transmission to establish a mapping, installation and efficiency plan for the purpose of building new electric transmission lines

Requires the office of renewable energy siting and electric transmission to establish a mapping, installation and efficiency plan for the purpose of building new electric transmission lines.
Showing 11 to 20 of 22 bills