This bill ends Maine's net energy billing program, which allowed residential and commercial solar customers to receive bill credits for excess electricity they sent back to the grid. It repeals all existing rules governing this program (including sections 3209-A, 3209-B, and 3209-C) and explicitly prohibits the Public Utilities Commission from requiring utilities to offer net energy billing in the future. The change directly affects current and future solar customers who previously relied on this billing method for compensation. It shifts Maine's policy away from compensating solar generators for exported energy toward a different framework for distributed generation.
This bill requires Maine's Public Utilities Commission to annually request informational bids for small modular nuclear reactors (SMRs) by October 1st each year. SMRs are defined as reactors under 350 megawatts, NRC-licensed, and capable of on-site construction or transport. The bids must include costs, location, timeline, and operational details - though they are non-binding and used only to inform potential future contracts. The Commission must submit annual reports to the Legislature's energy committee starting in 2026, and the bill terminates once the state accepts a bid for reactor establishment.
LD 1934 requires public entities in Maine (like towns, schools, and state agencies) to install or replace outdoor lighting that meets specific standards starting October 1, 2026. It limits brightness to 125% of recommended levels, mandates fully shielded fixtures for bright lights, bans nonessential lighting (like decorative signs or holiday lights) after 10 PM, caps color temperature at 3,000 kelvins, and restricts light trespass near protected areas to 0.1 lux. The bill directly affects how public facilities illuminate streets, parks, and buildings, aiming to reduce light pollution and energy waste. Key provisions include requiring shielded fixtures for lights over 1,000 lumens and ensuring sports lighting confines most light to the field area.
LD 1321 reformulates Maine's net energy billing program for solar and renewable energy systems. It limits new residential and small commercial systems to 20 kilowatts after November 2025 (with limited exemptions), caps shared ownership to 10 customers per project, and restricts individuals to owning no more than 5 systems. The bill sets a hard end date of December 31, 2045, or 20 years from a system's agreement date, whichever comes first. It also requires that renewable energy credits generated must be sold within Maine and adjusts compensation rates based on historical utility rates with annual 2.25% increases. This directly affects residential and small commercial customers with solar installations participating in net energy billing.
LD 371 removes a 100-megawatt capacity limit for hydroelectric generators, allowing larger projects to qualify as renewable energy sources. This directly affects hydroelectric developers seeking to build or expand facilities, as they will no longer face the previous size restriction. The bill also requires the Department of Environmental Protection to make approval decisions within 6 months of receiving complete applications and mandates public engagement through at least one community meeting. Additionally, it clarifies that approved projects may operate at full nameplate capacity, subject to existing environmental and fish passage requirements. These changes aim to streamline development while maintaining regulatory safeguards.
LD 197 requires Maine's Governor's Energy Office to study the state's future electric transmission infrastructure needs. The study must examine current permitting processes, best practices from other states, future renewable energy integration, available rights-of-way, and emerging technologies like grid-enhancing tools. The office must coordinate with state agencies and a stakeholder group - including utilities, environmental departments, and landowners - and submit a report by September 1, 2026. The report may inform future legislative proposals but does not mandate immediate infrastructure changes.
LD 1063 requires Maine's Public Utilities Commission to direct investor-owned electric utilities to competitively bid for contracts to purchase electricity and renewable energy credits from generators using municipal solid waste (trash) in combination with recycling. The bill mandates a competitive solicitation by November 1, 2025, for up to 35 megawatts of power, with contracts requiring pricing below 7 cents per kilowatt-hour and terms of 5-15 years. Only generators that pay Maine state excise, income, property, and sales taxes qualify for these contracts. This policy directly affects utilities (who must procure the power) and qualifying waste-to-energy generators (who must meet tax requirements to participate).
LD 830 requires solar energy developments in Maine to be concealed from view using a barrier like trees, bushes, or fencing that hides the panels from adjacent properties. The Department of Environmental Protection must verify this concealment before approving any new solar project. This bill directly affects solar developers, who must design projects with such barriers, and the Department, which gains authority to enforce this requirement during approvals.
This bill amends Maine's renewable energy law to include electricity generated by new nuclear power plants (constructed after January 1, 2025) as a qualifying renewable resource. It directly affects competitive electricity providers in Maine, who must meet renewable energy requirements under the state's portfolio standard. The key change adds new nuclear plants to the definition of "renewable capacity resource" in the law, allowing them to count toward compliance. This applies only to plants built after 2025, not existing nuclear facilities. The bill does not alter current renewable energy standards for existing sources like wind or solar.
LD 735 protects Sears Island's coastal sand dunes by requiring state agencies to obtain certification from an indigenous lands protection committee before authorizing any development on the island. This committee, composed of representatives from five Maine tribes and a gubernatorial appointee, must confirm proposed development areas do not contain sacred indigenous sites. The bill repeals prior laws permitting a wind terminal project and a conservation plan for a specific 10-acre parcel, and establishes a two-thirds vote requirement for any land development legislation conflicting with EPA regulations, with sponsorship limited to legislators from the affected district.