Amends the Public Utilities Act. Removes provisions prohibiting the construction of new nuclear power reactors with a nameplate capacity of more than 300 megawatts of electricity to be located within the State until the Illinois Emergency Management Agency and Office of Homeland Security finds that the United States Government has identified and approved a demonstrable technology or means for the disposal of high level nuclear waste.
Amends the Environmental Protection Act. Provides that no person shall conduct a carbon sequestration activity within a sequestration facility that overlies, underlies, or passes through a sole-source aquifer. Defines "sole-source aquifer". Effective immediately.
Amends the Environmental Protection Act. Defines "organic waste". Provides that no person shall conduct an organic waste composting operation, other than a landscape waste composting operation, without an Agency permit. Exempts from this permitting requirement: (1) persons conducting an organic waste composting operation that (i) has no more than 25 cubic yards of source-separated organic waste, composting additives, composting material, or end-product compost on-site at any one time and (ii) is not engaging in commercial activity and (2) persons conducting an organic waste composting operation that meets certain siting and operational requirements.
Creates the Powering Up Illinois Act. Defines terms. Sets forth findings. Requires an electric utility that operates within the State to (i) upgrade the State's electrical distribution systems as needed and in time to achieve the State's decarbonization goals, and implement federal, State, regional, and local air quality and decarbonization standards, plans, and regulations, (ii) conduct sufficient advance planning, engineering, and construction of increased distribution of system capacity by advance ordering transformers and other needed equipment so that customers can be energized without substantial delay, (iii) promptly energize new customers, including by ensuring that new housing, new businesses, and new charging for light-duty, medium-duty, and heavy-duty vehicles and off-road vehicles, vessels, trains, and equipment can be used without delay caused by a failure of the utility to implement energization projects, (iv) promptly upgrade service when needed by customers, (v) allow customers seeking energization to choose an optional flexible connection agreement, which shall provide a tariffed, voluntary utility offering that requires customers to agree to specified service levels as a requirement of energization or interconnection through the use of demand response technology that limits the net import and export of electricity at the point of common coupling to remain within the rated capacity limits of a customer's existing service connection or distribution circuit, either on a permanent basis or to allow for immediate project operations before service or distribution system upgrades are completed, and (vi) recruit, train, and retain an adequately sized and qualified workforce to carry out the planning, engineering, and construction of electrical distribution systems needed to promptly serve customers seeking energization and service upgrades without sacrificing other necessary activities of the workforce. Sets forth provisions concerning: the staffing of an electrification team; electric utility requirements; recovery of costs; and safety standards. Effective immediately.
Amends the Environmental Protection Act. Provides gas collection and control system requirements for municipal solid waste landfills, including requirements for gas to be collected from each area in which solid waste has been in place for at least one year, for gas to be drawn toward the gas control devices, for a gas collection and control system to be installed within 12 months of reaching certain thresholds, for gas collection and control design plans to provide for alternative preliminary measures, and for the methane destruction efficiency of flared systems to reach 99%.
Creates the Household Hazardous Waste Stewardship Act. Requires manufacturers, beginning January 1, 2027, to implement a stewardship program for covered products. Details manufacturer obligations under the stewardship program, including in the context of a stewardship organization comprised of manufacturers. Requires registration by April 1, 2026, and annually, for each manufacturer who sells covered products in the State and each stewardship organization. Details the roles of retailers and collections sites. Outlines stewardship plan components. Provides requirements for the Environmental Protection Agency for stewardship plan approval. Details requirements for a stewardship organization implementing a stewardship plan, as well as other statewide collection requirements. Details reporting requirements. Requires a stewardship organization to pay to the Agency an annual fee of $200,000, split if there is more than one stewardship organization. Provides for responsibilities for the Agency. Provides for immunity from antitrust laws. Provides for rulemaking authority for the Agency. Provides for civil and criminal penalties. Allows collection of covered products by a premium collection service. Makes findings. Defines terms. Effective immediately.