Groundwater sustainability agency: groundwater extraction permit: verification.
Summary
Existing law, the Sustainable Groundwater Management Act, requires all groundwater basins designated as high- or medium-priority basins by the Department of Water Resources that are designated as basins subject to critical conditions of overdraft to be managed under a groundwater sustainability plan or coordinated groundwater sustainability plans by January 31, 2020, and requires all other groundwater basins designated as high- or medium-priority basins to be managed under a groundwater sustainability plan or coordinated groundwater sustainability plans by January 31, 2022, except as specified. Existing law authorizes any local agency or combination of local agencies overlying a groundwater basin to decide to become a groundwater sustainability agency for that basin and imposes specified duties upon that agency or combination of agencies, as provided. Existing law authorizes a groundwater sustainability agency to request of the county, and requires a county to consider, that the county forward permit requests for the construction of new groundwater wells, the enlarging of existing groundwater wells, and the reactivation of abandoned groundwater wells to the agency before permit approval. Existing law also authorizes the State Water Resources Control Board to designate a high- or medium-priority basin as a probationary basin under certain conditions for specified purposes. Existing law requires the State Water Resources Control Board to adopt a model water well, cathodic protection well, and monitoring well drilling and abandonment ordinance implementing certain standards for water well construction, maintenance, and abandonment and requires each county, city, or water agency, where appropriate, not later than January 15, 1990, to adopt a water well, cathodic protection well, and monitoring well drilling and abandonment ordinance that meets or exceeds certain standards. Under existing law, if a county, city, or water agency, where appropriate, fails to adopt an ordinance establishing water well, cathodic protection well, and monitoring well drilling and abandonment standards, the model ordinance adopted by the state board is required to take effect on February 15, 1990, and is required to be enforced by the county or city and have the same force and effect as if adopted as a county or city ordinance. This bill would instead require a county to forward permit requests for the construction of new groundwater wells, the enlarging of existing groundwater wells, and the reactivation of abandoned groundwater wells to the groundwater sustainability agency before permit approval. The bill would prohibit a county, city, or any other water well permitting agency from approving a permit for a new groundwater well or for an alteration to an existing well in a basin subject to the act and classified as medium- or high-priority unless specified conditions are met, including that it obtains a written verification, from the groundwater sustainability agency that manages the basin or area of the basin where the well is proposed to be located, determining that, among other things, the extraction by the proposed well is consistent with any sustainable groundwater management program established in any applicable groundwater sustainability plan adopted by that groundwater sustainability agency or an alternate plan approved or under review by the Department of Water Resources. The bill would also require, as condition of approving a permit for a new groundwater well or for an alteration to an existing well in an above-described basin, a county, city, or any other water well permitting agency to, among other things, post the well permit application on its internet website for at least 30 days before approving a permit for a new groundwater well or for an alteration to an existing well. By imposing additional requirements on county, city, or any other water well permitting agency, the bill would impose a state-mandated local program. This bill would provide various exemptions from the above-described provisions, including exempting a permit for any well that provides less than 2 acre-feet of water annually for domestic use or any well used by a public water supply system or state small water system. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
Bill status
passed both
4 of 5 stages cleared
Introduction
Feb 2022
Committee Review
Aug 2022
Assembly Passage
May 2022
Senate Passage
Aug 2022
Governor
Introduced Feb 15, 2022
Last action Aug 30, 2022
Floor votes · Senate Aug 30, 2022 · Assembly May 23, 2022
How they voted
21–15
Passed · 1 other
Total votes 37
Aug 30, 2022
D
Democratic29
72% Yea
R
Republican8
100% Nay
Vote distribution
All Yea
All Nay
Mixed
No data
Full legislative history
Actions timeline
Total actions
26
Key actions
9
Committee
10
Amendments
9
Aug 30, 2022
Introduced
In Assembly. Concurrence in Senate amendments pending.
lower
Aug 30, 2022
Upper · Passed
Read third time. Passed. Ordered to the Assembly. (Ayes 22. Noes 16. Page 5241.).
upper
Aug 11, 2022
Upper · Passed
Read second time and amended. Ordered returned to second reading.
upper
Aug 11, 2022
Introduced
From committee: Amend, and do pass as amended. (Ayes 4. Noes 2.) (August 11).
upper
Aug 8, 2022
Committee
In committee: Referred to suspense file.
upper
Jun 30, 2022
Upper · Passed
From committee: Do pass and re-refer to Com. on APPR. (Ayes 3. Noes 1.) (June 29). Re-referred to Com. on APPR.
upper
Jun 22, 2022
Introduced
From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on GOV. & F.
upper
Jun 16, 2022
Upper · Passed
Read second time and amended. Re-referred to Com. on GOV. & F.
upper
Jun 15, 2022
Introduced
From committee: Amend, and do pass as amended and re-refer to Com. on GOV. & F. (Ayes 6. Noes 3.) (June 14).
upper
Jun 1, 2022
Committee
Referred to Coms. on N.R. & W. and GOV. & F.
upper
May 23, 2022
Lower · Passed
Read third time. Passed. Ordered to the Senate. (Ayes 44. Noes 24. Page 4833.)
lower
May 19, 2022
Lower · Passed
From committee: Do pass. (Ayes 12. Noes 4.) (May 19).
lower
May 18, 2022
Committee
In committee: Set, first hearing. Referred to suspense file.
lower
May 11, 2022
Lower · Passed
In committee: Hearing postponed by committee.
lower
Apr 28, 2022
Committee
Re-referred to Com. on APPR.
lower
Apr 27, 2022
Lower · Passed
Read second time and amended.
lower
Apr 26, 2022
Introduced
From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 8. Noes 5.) (April 26).
lower
Mar 21, 2022
Committee
Re-referred to Com. on W.,P., & W.
lower
Mar 17, 2022
Introduced
From committee chair, with author's amendments: Amend, and re-refer to Com. on W.,P., & W. Read second time and amended.
lower
Mar 17, 2022
Committee
Referred to Com. on W.,P., & W.
lower
Feb 16, 2022
Lower · Passed
From printer. May be heard in committee March 18.
lower
1 primary · 5 co-sponsors
Sponsors
Ask Maddy
·
AI policy assistant
Ask Maddy about AB 2201
Scope: CA
Hi! I can help you understand AB 2201. What would you like to know?
Try one of these
i
Maddy answers using official bill text and legislative records. Always verify before sharing.
Sources cited inline