SB 819 California Senate · 2017-2018 Regular Session

Electrical and gas corporations: rates.

Summary
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law authorizes the commission to establish rules for all public utilities, subject to control by the Legislature. Existing law authorizes the commission to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. Existing law prohibits a gas corporation from recovering any fine or penalty in any rate approved by the commission. This bill would additionally prohibit an electrical corporation from recovering a fine or penalty through a rate approved by the commission and would make related nonsubstantive changes. The Public Utilities Act authorizes the commission to ascertain and fix just and reasonable standards, classifications, regulations, practices, measurements, or service to be furnished, imposed, observed, and followed by specified public utilities, including all electrical corporations and gas corporations. If the commission finds, after a hearing, that the rules, practices, equipment, appliances, facilities, or service of any public utility, or the methods of manufacture, distribution, transmission, storage, or supply employed by the public utility, are unjust, unreasonable, unsafe, improper, inadequate, or insufficient, the act requires that the commission determine and, by order or rule, fix the rules, practices, equipment, appliances, facilities, service, or methods to be observed, furnished, constructed, enforced, or employed. This bill would prohibit an electrical corporation or gas corporation from recovering through a rate approved by the commission costs or expenses arising from damages caused by the electrical corporation's electric plant or the gas corporation's gas plant if the commission determines that the electrical or gas corporation, or its agent, did not reasonably construct, maintain, manage, control, or operate the plant and this unreasonable act or omission by the electrical or gas corporation, or its agent, increased the risk of the plant causing those damages. The bill would authorize the commission, for an electrical or gas corporation's rate application to recover costs or expenses, to authorize the recovery of those costs or expenses, in full or in part, and would specify that only those costs or expenses that are just and reasonable, which may comprise only a portion of those costs or expenses, are recoverable. The bill would state the intent of the Legislature and make legislative findings and declarations regarding the commission's rate recovery functions.
Bill status vetoed 4 of 5 stages cleared
Introduction
Jan 2018
Committee Review
Aug 2018
Senate Passage
May 2018
Assembly Passage
Aug 2018
Vetoed
Sep 2018
Introduced Jan 3, 2018 Vetoed Sep 21, 2018
Floor votes · Senate May 21, 2018 · Assembly Aug 27, 2018

How they voted

340
Passed
Total votes 34
May 21, 2018
D Democratic24
24 Yea
100% Yea
R Republican10
10 Yea
100% Yea
Vote distribution
All Yea All Nay Mixed No data
Full legislative history

Actions timeline

Total actions
34
Key actions
12
Committee
10
Amendments
3
Sep 21, 2018
Vetoed
In Senate. Consideration of Governor's veto pending.
upper
Sep 21, 2018
Vetoed
Vetoed by the Governor.
upper
Aug 28, 2018
Upper · Passed
Assembly amendments concurred in. (Ayes 39. Noes 0. Page 5875.) Ordered to engrossing and enrolling.
upper
Aug 28, 2018
Introduced
In Senate. Concurrence in Assembly amendments pending.
upper
Aug 27, 2018
Assembly · Passed
Assembly Vote: pass (72-0-1)
assembly
Aug 20, 2018
Lower · Passed
Read third time and amended.
lower
Aug 8, 2018
Lower · Passed
From committee: Do pass. Ordered to consent calendar. (Ayes 17. Noes 0.) (August 8).
lower
Jun 27, 2018
Lower · Passed
Read second time and amended. Re-referred to Com. on APPR.
lower
Jun 26, 2018
Lower · Passed
From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 9. Noes 0.) (June 26).
lower
Jun 21, 2018
Lower · Passed
From committee: Do pass and re-refer to Com. on JUD. (Ayes 15. Noes 0.) (June 20). Re-referred to Com. on JUD.
lower
May 31, 2018
Committee
Referred to Coms. on U. & E. and JUD.
lower
May 21, 2018
Senate · Passed
Senate Vote: pass (34-0)
senate
May 14, 2018
Upper · Passed
From committee: Be ordered to second reading pursuant to Senate Rule 28.8.
upper
Apr 25, 2018
Upper · Passed
From committee: Do pass and re-refer to Com. on APPR. (Ayes 7. Noes 0. Page 4813.) (April 24). Re-referred to Com. on APPR.
upper
Apr 25, 2018
Upper · Passed
From committee: Do pass and re-refer to Com. on APPR. (Ayes 6. Noes 0. Page 4812.) (April 24). Re-referred to Com. on APPR.
upper
Apr 18, 2018
Upper · Passed
From committee: Do pass and re-refer to Com. on JUD. (Ayes 10. Noes 0. Page 4717.) (April 17). Re-referred to Com. on JUD.
upper
Jan 16, 2018
Committee
Referred to Coms. on E., U. & C. and JUD.
upper
Jan 3, 2018
Introduced
Introduced. Read first time. To Com. on RLS. for assignment. To print.
upper
1 primary · 5 co-sponsors

Sponsors