SB 1434 California Senate · 2017-2018 Regular Session

Transportation electrification: electricity rate design.

Summary
Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations Existing law, enacted as part of the Clean Energy and Pollution Reduction Act of 2015, requires the PUC, in consultation with the State Energy Resources Conservation and Development Commission and State Air Resources Board, to direct electrical corporations to file applications for programs and investments to accelerate widespread transportation electrification to reduce dependence on petroleum, meet air quality standards, achieve the goals set forth in the Charge Ahead California Initiative, and reduce emissions of greenhouse gases to 40% below 1990 levels by 2030 and to 80% below 1990 levels by 2050. That law requires that the programs proposed by electrical corporations seek to minimize overall costs and maximize overall benefits. The PUC is required to approve, or modify and approve, programs and investments in transportation electrification, including those that deploy charging infrastructure, through a reasonable cost recovery mechanism, if they are consistent with the above-described purposes, do not unfairly compete with nonutility enterprises, include performance accountability measures, and are in the interests of ratepayers. This bill would require the PUC, on or before July 1, 2019, to direct an electrical corporation with more than 100,000 service connections in California to file a rate design application that supports and accelerates the deployment of zero-emission transit buses to reduce dependence on petroleum, meet air quality standards, and reduce emissions of greenhouse gases to 40% below 1990 levels by 2030 and to 80% below 1990 levels by 2050. This requirement would not apply to an electrical corporation with an approved or proposed rate tariff that meets the goals of the bill as of July 1, 2019. The bill would authorize an electrical corporation with 100,000 or fewer service connections in California to file a rate design application for those purposes. The bill would require a rate design proposed by an electrical corporation to seek to minimize overall costs and maximize overall benefits. The bill would require the commission to approve, or modify and approve, a rate design application filed by an electrical corporation if it is consistent with these requirements and is revenue neutral to the relevant customer class. Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime. Because the provisions of this bill are within the act and require action by the commission for implementation, the bill would impose a state-mandated local program. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.
Bill status passed 3 of 5 stages cleared
Introduction
Feb 2018
Committee Review
Aug 2018
Senate Passage
May 2018
Assembly Passage
Governor
Introduced Feb 16, 2018 Last action Aug 16, 2018
Floor votes · Senate May 29, 2018

How they voted

29–7
Passed · 3 other
Total votes 39
May 29, 2018
D Democratic26
26 Yea
100% Yea
R Republican13
3 Yea 7 Nay 3
53% Nay
Vote distribution
All Yea All Nay Mixed No data
Full legislative history

Actions timeline

Total actions
23
Key actions
8
Committee
8
Amendments
2
Aug 16, 2018
Lower · Passed
August 16 hearing: Held in committee and under submission.
lower
Jul 2, 2018
Lower · Passed
Read second time and amended. Re-referred to Com. on APPR.
lower
Jun 28, 2018
Lower · Passed
From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 7. Noes 3.) (June 27).
lower
Jun 21, 2018
Lower · Passed
From committee: Do pass and re-refer to Com. on C. & C. (Ayes 10. Noes 3.) (June 20). Re-referred to Com. on C. & C.
lower
Jun 11, 2018
Committee
Referred to Coms. on U. & E. and C. & C.
lower
May 29, 2018
Senate · Passed
Senate Vote: pass (29-7-3)
senate
May 25, 2018
Upper · Passed
From committee: Do pass. (Ayes 5. Noes 2. Page 4310.) (May 25).
upper
May 2, 2018
Upper · Passed
Read second time and amended. Re-referred to Com. on APPR.
upper
May 1, 2018
Upper · Passed
From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 8. Noes 1. Page 4851.) (April 25).
upper
Apr 4, 2018
Committee
Re-referred to Com. on E., U. & C.
upper
Mar 8, 2018
Committee
Referred to Com. on RLS.
upper
Feb 16, 2018
Introduced
Introduced. Read first time. To Com. on RLS. for assignment. To print.
upper
1 primary · 0 co-sponsors

Sponsors

Role
Legislator
Party
State
District
P
Photo of Connie M. Leyva
Connie M. Leyva
DDemocratic
CA
20