Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law authorizes the commission, after a hearing, to require every public utility to construct, maintain, and operate its line, plant, system, equipment, apparatus, tracks, and premises in a manner so as to promote and safeguard the health and safety of its employees, passengers, customers, and the public. Existing law requires electrical corporations to annually prepare and submit a wildfire mitigation plan to the commission for review. Existing law requires the commission to establish standards for disaster and emergency preparedness plans, as specified, and requires an electrical corporation to develop, adopt, and update an emergency and disaster preparedness plan, as specified. The California Emergency Services Act, among other things, establishes the Office of Emergency Services for the purpose of mitigating the effects of natural, manmade, or war-caused emergencies and makes findings and declarations relating to ensuring that preparation within the state will be adequate to deal with those emergencies. This bill would require the office, in consultation with specified public entities, by September 30, 2019, to adopt standards for reducing risks from a major event, as defined. The bill would require those standards to include model policies that may be undertaken by local governments regarding, among other things, defensible space, and actions that may be undertaken by an electrical or gas corporation, a local publicly owned electric or gas utility, or a water utility to reduce the risk of fire occurring during a major event. The bill would require the office to update the standards at least once every 2 years. This bill would require an electrical or gas corporation, on or before July 1, 2019, and every July 1 every two years thereafter, to submit to the commission an application for review and approval of a safety, reliability, and resiliency plan that includes certain elements. The bill would require the commission, no more than 18 months after the submission of the plan, to approve the plan with or without modification. The bill would require the commission to authorize recovery of the costs of implementing the plan through rates, as provided. The bill would require the commission to conduct an annual proceeding to review each electrical corporation's and gas corporation's compliance with its plan, as provided. If, after completing the compliance review, the commission determines that an electrical corporation or gas corporation is in substantial compliance with its plan, the bill would authorize the commission to find the performance, operations, management, and investment addressed in the plan to be reasonable and prudent, as specified. The bill would require the commission to assess a penalty on an electrical corporation or gas corporation for noncompliance with its plan. The bill would, except as provided, prohibit an electrical corporation from delegating, transferring, or contracting out any of its distribution system safety or reliability performance obligations, except as specified. Existing law authorizes the commission to fix the rates and charges for public utilities, including electrical or gas corporations, and requires the rates and charges to be just and reasonable. Under its existing regulatory authority, the commission uses a general rate case to address the costs of operating and maintaining the systems of public utilities and the allocation of those cost among the public utilities' customer classes. The commission has used a 3-year general rate case cycle, in which electrical or gas corporations file a general rate case application with the commission every 36 months. This bill would explicitly authorize the commission to extend the general rate case cycle to 4 years.
Bill status passed 3 of 5 stages cleared
Introduction
Feb 2018
Committee Review
Jul 2018
Senate Passage
May 2018
Assembly Passage
Governor
Introduced Feb 12, 2018 Last action Jul 5, 2018
Floor votes · Senate May 30, 2018

How they voted

34–2
Passed · 3 other
Total votes 39
May 30, 2018
D Democratic26
24 Yea 1 Nay 1
92% Yea
R Republican13
10 Yea 1 Nay 2
76% Yea
Vote distribution
All Yea All Nay Mixed No data
Full legislative history

Actions timeline

Total actions
31
Key actions
8
Committee
10
Amendments
1
Jul 5, 2018
Committee
Re-referred to Com. on RLS. pursuant to Assembly Rule 96.
lower
Jul 3, 2018
Lower · Passed
Read second time and amended. Re-referred to Com. on APPR.
lower
Jul 2, 2018
Lower · Passed
From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 15. Noes 1.) (June 28).
lower
Jun 21, 2018
Lower · Passed
From committee: Do pass and re-refer to Com. on G.O. (Ayes 8. Noes 2.) (June 20). Re-referred to Com. on G.O.
lower
Jun 7, 2018
Committee
Referred to Coms. on U. & E. and G.O.
lower
May 30, 2018
Senate · Passed
Senate Vote: pass (34-2-3)
senate
May 25, 2018
Upper · Passed
From committee: Do pass as amended. (Ayes 4. Noes 2. Page 4303.) (May 25).
upper
May 14, 2018
Upper · Passed
May 14 hearing postponed by committee.
upper
Apr 24, 2018
Upper · Passed
From committee: Do pass and re-refer to Com. on APPR. (Ayes 11. Noes 1. Page 4785.) (April 24). Re-referred to Com. on APPR.
upper
Apr 18, 2018
Upper · Passed
From committee: Do pass and re-refer to Com. on G.O. (Ayes 9. Noes 1. Page 4718.) (April 17). Re-referred to Com. on G.O.
upper
Apr 4, 2018
Committee
Re-referred to Coms. on E., U. & C. and G.O.
upper
Feb 22, 2018
Committee
Referred to Com. on RLS.
upper
Feb 12, 2018
Introduced
Introduced. Read first time. To Com. on RLS. for assignment. To print.
upper
1 primary · 0 co-sponsors

Sponsors

Role
Legislator
Party
State
District
P
Photo of Bill Dodd
Bill Dodd
DDemocratic
CA
3