AB 2856 California Assembly · 2015-2016 Regular Session

Intrastate transmission line: safety valves.

Summary
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including gas corporations, as defined. The Public Utilities Act authorizes the commission to ascertain and fix just and reasonable standards, classifications, regulations, practices, measurements, or services to be furnished, imposed, observed, and followed by specified public utilities, including gas corporations. Existing law requires the installation of automatic shutoff or remote controlled sectionalized block valves on certain intrastate transmission lines that are located in a high consequence area, as defined, or that traverse an active seismic earthquake fault. Existing law requires the owner or operator of a commission-regulated gas pipeline facility that is an intrastate transmission line to provide the commission with a valve location plan, along with any recommendations for valve locations, and authorizes the commission to make modifications to the valve location plan. This bill would make a nonsubstantive change to this provision.
Bill status in committee 1 of 4 stages cleared
Introduction
Feb 2016
Committee Review
Floor Vote
Governor
Introduced Feb 19, 2016 Last action Feb 22, 2016
Floor votes

How they voted

No floor votes recorded yet.
Full legislative history

Actions timeline

Total actions
3
Key actions
1
Committee
1
Feb 21, 2016
Lower · Passed
From printer. May be heard in committee March 22.
lower
Feb 19, 2016
Introduced
Introduced. To print.
lower
1 primary · 0 co-sponsors

Sponsors

Role
Legislator
Party
State
District
P
Photo of Autumn R. Burke
Autumn R. Burke
DDemocratic
CA
62