SB 108 California Senate · 2011-2012 Regular Session

Surface mining: idle mines.

Summary
The Surface Mining and Reclamation Act of 1975, with exceptions, prohibits a person from conducting a surface mining operation unless, among other things, a reclamation plan has been submitted to and approved by the lead agency for the operation. The act requires an operator, within 90 days of a surface mining operation becoming idle, to submit to the lead agency for review and approval, an interim management plan. The act defines idle to mean a curtailment for a period of one year or more of surface mining operations by more than 90% of the operation's previous maximum annual mineral production, with the intent to resume those surface mining operations at a future date. This bill would instead define idle to mean that an operator of a surface mining operation has curtailed production at the surface mining operation, with the intent to resume the surface mining operation at a future date, for a period of one year or more by more than 90% of its maximum annual mineral production within any of the last 5 years during which an interim management plan has not been approved. The act authorizes an interim management plan to remain in effect for a period not to exceed 5 years, after which, the lead agency is authorized to take certain actions, including renewing the interim management plan for another period not to exceed 5 years, if the lead agency finds that the surface mining operator has complied fully with the interim management plan. This bill would authorize the lead agency to renew the interim management plan for additional 5-year periods, if the lead agency finds that the surface mining operator has complied fully with the interim management plan. Existing law requires the owner or operator of a mining operation to forward to the Director of Conservation an annual report that identifies certain things about the mining operation including the mining operation's status and the type and total amount of commodities produced. This bill would authorize a mine operator who has failed to properly report mineral production or status in any year prior to January 1, 2012, to attach corrected annual reports to the 2012 annual report so long as the corrected report is submitted on or before July 1, 2013, among other things. The bill would authorize a mine to return to idle status after being considered abandoned prior to January 1, 2013, if an interim management plan is approved by July 1, 2013, and upon lead agency verification of compliance with the above provisions. The bill would authorize the Office of Mine Reclamation to enter any mine site for which a mine operator has requested a correction of mine status in order to conduct an inspection, as provided, and the bill would require the mine operator to be responsible for the reasonable cost of this inspection.
Bill status signed all 5 stages cleared
Introduction
Jan 2011
Committee Review
Sep 2011
Senate Passage
May 2011
Assembly Passage
Sep 2011
Signed into Law
Oct 2011
Introduced Jan 13, 2011 Signed Oct 6, 2011
Floor votes · Senate Sep 9, 2011 · Assembly Sep 8, 2011

How they voted

34–0
Passed · 1 other
Total votes 35
Sep 9, 2011
D Democratic23
22 Yea 1
95% Yea
R Republican12
12 Yea
100% Yea
Vote distribution
All Yea All Nay Mixed No data
Full legislative history

Actions timeline

Total actions
32
Key actions
7
Committee
6
Amendments
3
Oct 5, 2011
Signed into law
Approved by the Governor.
legislature
Sep 9, 2011
Senate · Passed
Senate Vote: pass (34-0-1)
senate
Sep 8, 2011
Assembly · Passed
Assembly Vote: pass (69-0-3)
assembly
Sep 8, 2011
Upper · Passed
Assembly amendments concurred in. (Ayes 39. Noes 0. Page 2406.) Ordered to engrossing and enrolling.
upper
Sep 7, 2011
Introduced
In Senate. Concurrence in Assembly amendments pending.
upper
Aug 26, 2011
Lower · Passed
From committee: Do pass as amended. (Ayes 17. Noes 0.) (August 25).
lower
Jul 13, 2011
Committee
Set, first hearing. Referred to APPR. suspense file.
lower
Jun 28, 2011
Committee
From committee: Do pass and re-refer to Com. on APPR. (Ayes 9. Noes 0.) (June 27). Re-referred to Com. on APPR.
lower
Jun 2, 2011
Committee
Referred to Com. on NAT. RES.
lower
May 17, 2011
Upper · Passed
From committee: Do pass. (Ayes 8. Noes 0. Page 1013.) (May 16).
upper
May 2, 2011
Upper · Passed
From committee: Do pass as amended and re-refer to Com. on APPR. with recommendation: To consent calendar. (Ayes 9. Noes 0. Page 740.) (April 26).
upper
Feb 10, 2011
Committee
Referred to Com. on N.R. & W.
upper
Jan 13, 2011
Introduced
Introduced. Read first time. To Com. on RLS. for assignment. To print.
upper
0 primary · 0 co-sponsors

Sponsors

No sponsor information available.