Net energy metering.
Summary
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. Existing law, relative to private energy producers, requires every electric utility, as defined, to make available to an eligible customer-generator, as defined, a standard contract or tariff for net energy metering on a first-come-first-served basis until the time that the total rated generating capacity of renewable electrical generation facilities, as defined, used by eligible customer-generators exceeds 5% of the electric utility's aggregate customer peak demand. The existing definition of an eligible customer-generator requires that the generating facility use a solar or wind turbine, or a hybrid system of both, and have a generating capacity of not more than one megawatt. Electrical corporations are an electric utility for these purposes. This bill would require the commission to complete a study by October 1, 2013, to determine who benefits from, and who bears the economic burden, if any, of, the net energy metering program, and to determine the extent to which each class of ratepayers and each region of the state receiving service under the net energy metering program is paying the full cost of the services provided to them by electrical corporations, and the extent to which those customers pay their share of the costs of public purpose programs. The bill would require the commission to report the results of the study to the Legislature within 30 days of its completion. Existing law establishes separate requirements for wind energy co-metering that provides a credit against the generation component of an electricity bill of an electric utility for those customer-generators utilizing a wind energy project greater than 50 kilowatts, but not exceeding one megawatt. The wind energy co-metering provisions include a requirement that the eligible customer-generator utilize a meter, or multiple meters, capable of separately measuring electricity flow in both directions. This bill would state that nothing in the wind energy co-metering provisions precludes the use of advanced metering infrastructure devices.
Bill status
signed
all 5 stages cleared
Introduction
Feb 2012
Committee Review
Aug 2012
Assembly Passage
May 2012
Senate Passage
Aug 2012
Signed into Law
Sep 2012
Introduced Feb 24, 2012
Signed Sep 27, 2012
Floor votes · Senate Aug 20, 2012 · Assembly May 31, 2012
How they voted
29–5
Passed · 5 other
Total votes 39
Aug 20, 2012
D
Democratic24
62% Yea
R
Republican15
93% Yea
Vote distribution
All Yea
All Nay
Mixed
No data
Full legislative history
Actions timeline
Total actions
27
Key actions
9
Committee
9
Amendments
3
Sep 27, 2012
Signed into law
Approved by the Governor.
legislature
Aug 27, 2012
Lower · Passed
Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 63. Noes 6. Page 6322.).
lower
Aug 22, 2012
Introduced
In Assembly. Concurrence in Senate amendments pending. May be considered on or after August 24 pursuant to Assembly Rule 77.
lower
Aug 20, 2012
Senate · Passed
Senate Vote: pass (29-5-5)
senate
Aug 7, 2012
Upper · Passed
From committee: Do pass. (Ayes 7. Noes 0.) (August 6).
upper
Aug 6, 2012
Upper · Passed
From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 7. Noes 2.) (July 3).
upper
Jun 27, 2012
Committee
Re-referred to Com. on E., U. & C.
upper
Jun 14, 2012
Committee
Referred to Com. on RLS.
upper
May 31, 2012
Assembly · Passed
Assembly Vote: pass (55-9-15)
assembly
May 25, 2012
Lower · Passed
From committee: Do pass. (Ayes 17. Noes 0.) (May 25).
lower
May 16, 2012
Committee
In committee: Set, first hearing. Referred to APPR. suspense file.
lower
May 2, 2012
Committee
Re-referred to Com. on APPR.
lower
Apr 30, 2012
Lower · Passed
From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 11. Noes 0.) (April 16).
lower
Mar 22, 2012
Committee
Referred to Com. on U. & C.
lower
Feb 26, 2012
Lower · Passed
From printer. May be heard in committee March 27.
lower
Feb 24, 2012
Introduced
Introduced. To print.
lower
1 primary · 0 co-sponsors
Sponsors
Role
Legislator
Party
State
District
P
Steve Bradford
DDemocratic
Ask Maddy
·
AI policy assistant
Ask Maddy about AB 2514
Scope: CA
Hi! I can help you understand AB 2514. What would you like to know?
Try one of these
i
Maddy answers using official bill text and legislative records. Always verify before sharing.
Sources cited inline