An act relating to plug-in photovoltaic devices
What changed between versions
A new category called 'portable solar energy generation device' was created, defined as a movable photovoltaic device with a maximum power output of 1,200 watts to the grid, designed to be plugged into a receptacle, and intended primarily to offset the customer's own electricity consumption. This is distinct from the existing 'plug-in photovoltaic device' category.
The Public Utility Commission must develop a simple notification form by September 10, 2026 for customers who install portable solar energy devices. The form must include customer name, contact information, installation address, electric utility, and meter number, and must be available online and in printable form.
The enacted version includes an amendment to 9 V.S.A. section 2795 updating the federal efficiency standards reference date from January 19, 2017 to January 19, 2025 and adding a reference to electric motor conservation standards signed January 8, 2025. This section does not appear in the passed-by-both-chambers version.
The bill now covers two separate device categories with different regulatory treatments. Portable solar devices have fewer requirements (no IEEE 1547-2018 compliance needed, no cost recovery provision for overloading) while plug-in photovoltaic devices retain the more stringent technical standards including IEEE 1547-2018 and regional transmission operator profiles.
Tenant/landlord provisions for plug-in photovoltaic devices were modified. The enacted version requires tenants to get landlord permission and gives landlords the right to deny installation, while the passed version's portable solar section omits tenant/landlord provisions entirely.