Rail and Highway Transmission Planning Act
This bill directs the federal government to conduct a study on co-locating high-voltage power lines on existing highway and rail corridors. The study, led by the Energy Secretary with input from transportation agencies and stakeholders, will assess technical feasibility, safety, costs, and benefits of building transmission infrastructure within these rights-of-way. It will identify suitable corridors, evaluate different line configurations (like overhead or underground), and analyze impacts on grid reliability, energy costs, and transportation operations. The study must produce public reports within three years, including data to help accelerate future transmission projects without requiring immediate construction. This focuses on planning and data-sharing to address grid capacity constraints, directly affecting federal agencies, utilities, and transportation infrastructure owners.
Bill status
in committee
1 of 4 stages cleared
Introduction
Feb 2026
Committee Review
Floor Vote
President
Introduced Feb 5, 2026
Last action Feb 5, 2026
Floor votes
How they voted
No floor votes recorded yet.
Full legislative history
Actions timeline
Total actions
2
Key actions
0
Committee
1
Feb 5, 2026
Committee
Referred to the House Committee on Energy and Commerce.
lower
Feb 5, 2026
Introduced
Introduced in House
lower
1 primary · 3 co-sponsors
Sponsors
Role
Legislator
Party
State
District
P
Kevin Mullin
DDemocratic
Co
Eric Sorensen
DDemocratic
Co
Eugene Simon Vindman
DDemocratic
Co
Kim Schrier
DDemocratic
Ask Maddy
·
AI policy assistant
Ask Maddy about HR 7405
Scope: US
Hi! I can help you understand HR 7405. What would you like to know?
Try one of these
i
Maddy answers using official bill text and legislative records. Always verify before sharing.
Sources cited inline