HB 4290 Texas House · 89th Legislature (2025)

Relating to a qualifying cogenerator that serves a large load and a colocated desalination facility.

HB 4290 amends Texas Utilities Code to clarify that certain energy facilities - specifically qualifying cogenerators serving digital product manufacturing and co-located desalination plants - do not count as retail electric utilities. The bill defines a qualifying cogenerator as one providing electricity and thermal/steam waste heat to a desalination facility on the same site, while primarily powering digital manufacturing operations. This exemption prevents such facilities from being regulated as retail electric providers under Texas law, streamlining their operations. The change applies to existing facilities that met specific environmental and construction timelines (e.g., pre-1998 permits and construction).
Bill status passed 3 of 5 stages cleared
Introduction
Apr 2025
Committee Review
May 2025
House Passage
May 2025
Senate Passage
Governor
Introduced Apr 1, 2025 Last action May 6, 2025
Maddy AI version diff · 1 comparison

What changed between versions

Introduced Engrossed · 3 edits · May 2, 2025
MINOR
This bill was updated from an introduced draft to an engrossed version, primarily adding a new line about digital content accessibility standards and reformatting the bill text. The substantive legislative content regarding qualifying cogenerators and retail electric utilities appears to remain unchanged in meaning, though the formatting and line breaks were significantly altered during the revision process.
Scope change
No substantive change to the bill's scope or applicability; the core definitions and provisions remain the same despite formatting updates.
TECHNICAL

Added a line about updating digital content on TLO to align with WCAG 2.1 accessibility standards, which appears to be an administrative note rather than a legislative provision.

Significant reformatting of the bill text with changes in line breaks, spacing, and header information, but no substantive policy changes to the definitions of qualifying cogenerators or retail electric utilities.

Removed draft formatting markers and line numbers that were present in the introduced version but do not affect the actual legislative content.

Floor votes · House May 1, 2025

How they voted

1390
Passed · 5 other
Total votes 144
May 1, 2025
D Democratic59
57 Yea 2
96% Yea
R Republican85
82 Yea 3
96% Yea
Vote distribution
All Yea All Nay Mixed No data
Full legislative history

Actions timeline

Total actions
28
Key actions
9
Committee
7
Amendments
2
May 6, 2025
Committee
Referred to Business & Commerce
upper
May 6, 2025
Introduced
Read first time
upper
May 5, 2025
Introduced
Received from the House
upper
May 2, 2025
Lower · Passed
Passed
lower
May 1, 2025
Lower · Passed
Passed to engrossment as amended
lower
May 1, 2025
Lower · Passed
Amended
lower
May 1, 2025
House · Passed
House Vote: pass (139-0-5)
house
Apr 25, 2025
Lower · Passed
Committee report sent to Calendars
lower
Apr 23, 2025
Lower · Passed
Committee report distributed
lower
Apr 16, 2025
Lower · Passed
Reported favorably as substituted
lower
Apr 14, 2025
Lower · Passed
Left pending in committee
lower
Apr 14, 2025
Lower · Passed
Testimony taken/registration(s) recorded in committee
lower
Apr 1, 2025
Committee
Referred to State Affairs
lower
Apr 1, 2025
Introduced
Read first time
lower
4 primary · 1 co-sponsor

Sponsors