HB 4091 Texas House · 89th Legislature (2025)

Relating to the interconnection of the ERCOT power grid to grids outside the ERCOT power region.

HB 4091 allows Texas utilities, cooperatives, and municipally owned power providers to build and operate facilities connecting the ERCOT grid (Texas' power grid) to external power grids. It authorizes these entities to purchase wholesale power from outside ERCOT and interconnect transmission lines across regional boundaries. The bill establishes new rules requiring a minimum 4.3 gigawatt transfer capability between ERCOT and other regions, with the Public Utility Commission overseeing federal approvals and reliability standards. This policy change directly affects Texas power providers seeking to expand grid connections and energy sourcing beyond current ERCOT boundaries.
Bill status in committee 1 of 4 stages cleared
Introduction
Mar 2025
Committee Review
Floor Vote
Governor
Introduced Mar 27, 2025 Last action Mar 27, 2025
Floor votes

How they voted

No floor votes recorded yet.
Full legislative history

Actions timeline

Total actions
3
Key actions
0
Committee
1
Mar 27, 2025
Committee
Referred to State Affairs
lower
Mar 27, 2025
Introduced
Read first time
lower
1 primary · 0 co-sponsors

Sponsors

Role
Legislator
Party
State
District
P
RA
Rafael Anchía
DDemocratic
TX
103