A 8934 New York Assembly · 2025 Regular Session

Relates to advanced transmission technologies

Summary
Directs electric corporations and combination electric and gas corporations to file a cost-effectiveness and timetable analysis as part of any base rate proceeding with the public service commission; directs NYSERDA to conduct a study on the effectiveness of advanced transmission technologies.
Bill status in committee 1 of 4 stages cleared
Introduction
Jul 2025
Committee Review
Floor Vote
Governor
Introduced Jul 16, 2025 Last action Jun 5, 2026
Maddy AI version diff · 2 comparisons

What changed between versions

A8934A A8934B · 4 edits
MODERATE
The bill was amended to broaden its scope by adding new sponsors and updating the title to reflect only the Public Service Law. Key substantive changes include redefining 'advanced conductors' to require substantially lower resistance rather than a specific 10% threshold, and shifting the requirement for cost-effectiveness analyses from base rate proceedings to hearings involving major rate changes or capital improvements initiated one year after the bill takes effect.
Scope change
The bill's scope was narrowed in its title to apply only to the Public Service Law, and the applicability of the cost-effectiveness analysis requirement was modified to trigger specifically during hearings for major rate changes or capital improvements starting one year after enactment.
DEFINITION

The definition of 'advanced conductors' was changed from requiring a specific 'at least ten percent lower' electrical resistance to a more general requirement of 'substantially lower' resistance.

TIMELINE

The mandatory filing of cost-effectiveness analyses was moved from 'any base rate proceeding' to hearings initiated 'one year after the effective date of this section' that consider major rate changes or capital improvements.

SCOPE

The bill title was updated to remove reference to the Public Authorities Law, limiting the amendment strictly to the Public Service Law.

REQUIREMENT

The term 'New York independent system operator' was replaced with 'federally designated bulk system operator' in the requirement to file cost-effectiveness analyses.

Floor votes

How they voted

No floor votes recorded yet.
Full legislative history

Actions timeline

Total actions
8
Key actions
4
Committee
4
Amendments
4
Jun 5, 2026
Committee
REPORTED REFERRED TO RULES
lower
May 19, 2026
Committee
REPORTED REFERRED TO WAYS AND MEANS
lower
May 14, 2026
Lower · Passed
PRINT NUMBER 8934B
lower
May 14, 2026
Lower · Passed
AMEND (T) AND RECOMMIT TO ENERGY
lower
Mar 13, 2026
Lower · Passed
PRINT NUMBER 8934A
lower
Mar 13, 2026
Lower · Passed
AMEND (T) AND RECOMMIT TO ENERGY
lower
Jan 7, 2026
Committee
REFERRED TO ENERGY
lower
Jul 16, 2025
Committee
REFERRED TO ENERGY
lower
1 primary · 17 co-sponsors