SB 216 Louisiana Senate · 2025 Regular Session

TRANSPORTATION/DEV DEPT: Authorizes the Department of Transportation and Development to use certain bidding processes. (gov sig) (EN NO IMPACT See Note)

SB 216 is a procedural bill that updates the numbering of sections within the Department of Transportation and Development's bidding process rules. It changes references from "(a)", "(b)", "(c)", and "(d)" to "(1)", "(2)", "(3)", and "(4)" for clarity in administrative documents. This technical amendment does not create new policies or affect any external entities, as noted by its "EN NO IMPACT" designation. The bill passed unanimously in the Senate and is now moving to the House for consideration.
Bill status signed all 5 stages cleared
Introduction
Apr 2025
Committee Review
May 2025
Senate Passage
May 2025
House Passage
Jun 2025
Signed into Law
Jun 2025
Introduced Apr 4, 2025 Signed Jun 11, 2025
Maddy AI version diff · 5 comparisons

What changed between versions

Senate Floor Bureau Note, #2014, Connick, Adopted SB216 Act · 4 edits
MODERATE
This bill enacts a new law allowing the Louisiana Department of Transportation and Development to use the A+B bidding method for road construction projects. This method combines traditional unit pricing with a time penalty to incentivize faster project completion. The law specifically applies to large, complex projects meeting certain criteria, such as high traffic volume, long duration, or high cost.
Scope change
The bill expands the scope of available bidding methods by introducing a new option (A+B) for specific types of road construction projects that were previously not eligible for this method.
REQUIREMENT

Added authority for the Department of Transportation and Development to use the A+B bidding method, which combines cost and time estimates to determine the winning bid.

ELIGIBILITY

Established specific eligibility criteria for using A+B bidding, including projects with over 20,000 average daily vehicles, construction times exceeding 365 days, costs over $10 million, or those built in multiple phases.

DEFINITION

Defined 'A+B bidding' as a cost-plus-time bidding method where the lowest combined total of unit price and time penalty wins the contract.

TIMELINE

Set an effective date of July 1, 2025, for the department to begin evaluating the use of this new bidding method.

Floor votes · Senate May 20, 2025 · House Jun 3, 2025

How they voted

340
Passed · 3 other
Total votes 37
May 20, 2025
D Democratic11
9 Yea 2
81% Yea
R Republican26
25 Yea 1
96% Yea
Vote distribution
All Yea All Nay Mixed No data
Full legislative history

Actions timeline

Total actions
18
Key actions
4
Committee
4
Amendments
1
Jun 3, 2025
Lower · Passed
Read third time by title, roll called on final passage, yeas 94, nays 0. Finally passed, ordered to the Senate.
lower
May 28, 2025
Introduced
Reported without Legislative Bureau amendments.
lower
May 27, 2025
Lower · Passed
Reported favorably (8-0). Referred to the Legislative Bureau.
lower
May 22, 2025
Committee
Read by title, under the rules, referred to the Committee on Transportation, Highways and Public Works.
lower
May 20, 2025
Upper · Passed
Read by title, passed by a vote of 36 yeas and 0 nays, and sent to the House. Motion to reconsider tabled.
upper
May 14, 2025
Upper · Passed
Reported with amendments.
upper
Apr 14, 2025
Committee
Introduced in the Senate; read by title. Rules suspended. Read second time and referred to the Committee on Transportation, Highways and Public Works.
upper
1 primary · 1 co-sponsor

Sponsors