HB 1173 Indiana House · 2023 Regular Session

Utility scale battery energy storage systems.

Summary
Provides that a person may not: (1) construct a new utility scale battery energy storage system (BESS); or (2) expand the capacity of an existing BESS by more than 10% of the system's original capacity; without the prior approval of the department of homeland security (department). Sets forth information that must be included in an application to the department for approval of the construction or expansion of a BESS. Provides that: (1) a BESS for which installation is subject to department approval; and (2) an installation added to an existing BESS in an expansion for which department approval is required; must comply with the National Fire Protection Association's standard concerning stationary energy storage systems (NFPA 855). Provides that the total capacity of the batteries contained within a single enclosure in: (1) a BESS for which installation is subject to department approval; and (2) an installation added to an existing BESS in an expansion for which department approval is required; may not exceed 10 megawatt hours unless authorized under rules adopted by the fire prevention and building safety commission (commission). Provides that if a BESS installed after June 30, 2023, is located less than 1/2 mile from the nearest 100 year flood plain, all of the system's equipment must be located at least two feet above the 100 year frequency flood elevation. Requires the operator of a BESS to: (1) provide a copy of the operator's emergency response plan for the BESS; and (2) offer training to enable effective response to a fire or contaminant discharge at the BESS; to the fire department responsible for providing fire protection services in the area in which the BESS is located. Authorizes the commission to adopt rules to specify standards for the installation and operation of a BESS. Provides that the commission's rules: (1) must be consistent with NFPA 855; and (2) must include standards for: (A) chemical spill prevention and control; and (B) appropriate setbacks from surface water resources. Requires the department to issue to the interim study committee on energy, utilities, and telecommunication, not later than November 1, 2023, a report regarding the progress of the commission in adopting rules addressing the installation and operation of a BESS.
Bill status signed all 5 stages cleared
Introduction
Jan 2023
Committee Review
Apr 2023
House Passage
May 2023
Senate Passage
Apr 2023
Signed into Law
May 2023
Introduced Jan 10, 2023 Signed May 4, 2023
Floor votes · Senate Mar 28, 2023

How they voted

470
Passed · 1 other
Total votes 48
Mar 28, 2023
D Democratic10
9 Yea 1
90% Yea
R Republican38
38 Yea
100% Yea
Vote distribution
All Yea All Nay Mixed No data
Full legislative history

Actions timeline

Total actions
30
Key actions
10
Committee
4
Amendments
1
May 4, 2023
Signed into law
Signed by the Governor
executive
May 1, 2023
Lower · Passed
Signed by the Speaker
lower
Apr 28, 2023
Upper · Passed
Signed by the President of the Senate
upper
Apr 28, 2023
Upper · Passed
Signed by the President Pro Tempore
upper
Apr 24, 2023
Lower · Passed
Rules Suspended. Conference Committee Report 1: adopted by the House; Roll Call 484: yeas 94, nays 0
lower
Apr 24, 2023
Upper · Passed
Conference Committee Report 1: adopted by the Senate; Roll Call 471: yeas 46, nays 0
upper
Apr 6, 2023
Introduced
House dissented from Senate amendments
lower
Mar 28, 2023
Upper · Passed
Third reading: passed; Roll Call 268: yeas 49, nays 0
upper
Mar 23, 2023
Upper · Passed
Committee report: amend do pass, adopted
upper
Feb 14, 2023
Lower · Passed
Third reading: passed; Roll Call 122: yeas 95, nays 0
lower
Feb 9, 2023
Lower · Passed
Committee report: amend do pass, adopted
lower
3 primary · 4 co-sponsors

Sponsors