PR 26-0278 Legislature · 26th Council Period (2025-2026)

Long Bridge Project Emergency Declaration Resolution of 2025

This resolution declares an emergency to temporarily amend the District's Urban Forest Preservation Act, allowing the removal of a Heritage Tree directly on the Long Bridge Project site. It specifically affects the Long Bridge Project (managed by the Virginia Passenger Rail Authority and DC's Department of Transportation), which needs to remove an American Elm tree blocking construction. The key provision requires applicants to prove the tree cannot be protected in place or relocated without excessive cost ($1 million+) or public disruption, and mandates payment of $1,200 per inch of the tree's circumference ($37,890 total for this tree). This exception enables the project to proceed without violating current Heritage Tree protections.
Bill status signed all 4 stages cleared
Introduction
Jul 2025
Committee Review
Council Passage
Jul 2025
Signed into Law
Jul 2025
Introduced Jul 11, 2025 Signed Jul 14, 2025
Maddy AI version diff · 1 comparison

What changed between versions

Introduction → Enrollment · 4 edits
MODERATE
The bill was enrolled and finalized after passing the Council, with minor formatting changes and one substantive addition. The most significant change is the addition of a new section (j) that establishes specific conditions for removing a Heritage Tree under emergency legislation, including cost thresholds and fee requirements. This clarifies exactly when and how the tree removal exception can be used.
Scope change
The bill's scope remains focused on the Long Bridge Project and the American Elm tree, but the enrolled version adds clearer procedural requirements for permit applicants seeking to remove a Heritage Tree under emergency conditions.
REQUIREMENT

Added new section (j) requiring applicants to demonstrate that protecting the tree in place is not feasible and that relocation would cost more than $1 million or unreasonably burden the public.

FISCAL

Added requirement that applicants must pay $1,200 per inch of tree circumference to the District for Heritage Tree removal under this emergency provision.

TECHNICAL

Minor formatting and line break changes throughout the document as it was enrolled and finalized for official adoption.

TIMELINE

Added section (k) confirming the emergency legislation is necessary to prevent unreasonable delays or significant additional costs to the Long Bridge Project.

Floor votes · Council Jul 14, 2025

How they voted

11–0
Passed · 1 other
Total votes 12
Jul 14, 2025
D Democratic10
9 Yea 1
90% Yea
I Independent2
2 Yea
100% Yea
Vote distribution
All Yea All Nay Mixed No data
Full legislative history

Actions timeline

Total actions
6
Key actions
1
Committee
0
Jul 14, 2025
Council · Passed
Council Vote: pass (11-0-1)
council
Jul 11, 2025
Introduced
PR26-0278 Introduced by Councilmember Allen at Office of the Secretary
legislature
1 primary · 0 co-sponsors

Sponsors

Role
Legislator
Party
State
District
P
Photo of Charles Allen
Charles Allen
DDemocratic
DC
Ward 6