HB 25-1260 Colorado House · 2025 Regular Session

Electrical Generation & Distribution Resiliency

Summary
The bill requires the public utilities commission (commission) to evaluate electrical generation and grid resilience against geomagnetic storms (evaluation) and report the findings of the evaluation to the general assembly. The bill requires each electrical utility that is subject to the jurisdiction of the North American Electric Reliability Corporation to annually submit a critical energy infrastructure information request to the federal energy regulatory commission. If the utility receives the permission, each of these electrical utilities must annually brief the general assembly on the utility's contingency action plan and any information necessary to: Evaluate the ability of and identify shortfalls to restoring electrical power operation, fuel delivery, and equipment function within specified time frames following certain types of geomagnetic storms; and Evaluate the certification of hardware and software monitoring and controlling systems for energy generation and distribution. The bill sets standards for the evaluation. Based on the evaluation, the commission shall adopt rules requiring an electrical utility to meet resiliency standards for geomagnetic storms. The rules include: Requiring the monitoring of the space weather prediction center of the national oceanic and atmospheric administration in order to isolate large power transformers and power generation from the grid; Mechanically isolating critical components if or when a coronal mass ejection is likely to cause geomagnetically induced currents; Restricting or closing fuel pipeline valves to mitigate damage in a sectional failure; Installing automatic neutral ground blocking devices in large power transformers; Ensuring that computer equipment can be mechanically isolated from the grid and sheltered from geomagnetically induced surges; Requiring all networked systems that operate electrical generation and distribution to be electronically and physically separable from the outside networks; and Requiring the cyber-certification of hardware and software that operate electrical generation and distribution. (Note: Italicized words indicate new material added to the original summary; dashes through words indicate deletions from the original summary.) (Note: This summary applies to the reengrossed version of this bill as introduced in the second house.)
Bill status passed 3 of 5 stages cleared
Introduction
Feb 2025
Committee Review
Apr 2025
House Passage
Apr 2025
Senate Passage
Governor
Introduced Feb 13, 2025 Last action Apr 23, 2025
Maddy AI version diff · 4 comparisons

What changed between versions

PA1 (03/06/2025) PA2 (04/03/2025) · 1 edit
MINOR
The bill was amended to refine the definition of geomagnetic storms, clarifying them as a specific type of geomagnetic disturbance rather than a major disturbance itself. This change improves scientific accuracy and ensures the legislation aligns better with current understanding of space weather impacts on infrastructure.
DEFINITION

The definition of geomagnetic storms was updated to specify they are a type of geomagnetic disturbance, adding precision to the scientific terminology used in the bill.

Floor votes · House Apr 14, 2025

How they voted

558
Passed · 1 other
Total votes 64
Apr 14, 2025
D Democratic42
34 Yea 7 Nay 1
80% Yea
R Republican22
21 Yea 1 Nay
95% Yea
Vote distribution
All Yea All Nay Mixed No data
Full legislative history

Actions timeline

Total actions
9
Key actions
3
Committee
3
Apr 23, 2025
Upper · Passed
Senate Committee on Transportation & Energy Postpone Indefinitely
upper
Apr 15, 2025
Introduced
Introduced In Senate - Assigned to Transportation & Energy
upper
Apr 14, 2025
Lower · Passed
House Third Reading Passed - No Amendments
lower
Mar 31, 2025
Lower · Passed
House Committee on Finance Refer Amended to House Committee of the Whole
lower
Mar 5, 2025
Committee
House Committee on Energy & Environment Refer Amended to Finance
lower
Feb 13, 2025
Introduced
Introduced In House - Assigned to Energy & Environment
lower
3 primary · 15 co-sponsors

Sponsors