Increasing Efficiency Division of Water Resources
Summary
The division of water resources in the department of natural resources (division) is responsible for administering water rights and issuing water well permits, among other duties. Under current law, after having received a permit to appropriate designated groundwater or construct a well outside the boundaries of a designated groundwater basin, a permit holder is required to construct the well within one year after the date of issuance of the permit. If the well is not constructed within one year, the permit expires; except that the ground water commission (commission) in the division or the state engineer, as applicable, may grant a single one-year extension. The act extends the time frame for construction of a well to 2 years, eliminating the need for the commission or the state engineer to approve a one-year extension to the initial one-year construction time frame, except for permits issued for federally authorized water projects. The act also removes the requirement that the commission or state engineer must mail a certified letter to the permit holder before a permit can be formally expired. The act allows the commission or state engineer to reinstate an expired permit if the applicant for reinstatement of the permit can show that the well was completed in a timely manner and submits a $30 fee. Under current law, the division engineer of each water division is required to decennially present to the water court a list of water rights that meet the criteria for abandonment. The act splits this decennial abandonment process into 2 batches, grouped by water division and spaced 5 years apart, beginning with 2030 and 2035. The act maintains the requirement that the abandonment process be performed every 10 years in each water division. The act extends certain time frames relating to the well permitting process. Lastly, the act eliminates final permitting requirements for non-Denver Basin bedrock aquifer wells in the designated basins. (Note: This summary applies to this bill as enacted.)
Bill status
signed
all 5 stages cleared
Introduction
Jan 2025
Committee Review
Apr 2025
House Passage
Mar 2025
Senate Passage
Apr 2025
Signed into Law
Jun 2025
Introduced Jan 8, 2025
Signed Jun 3, 2025
Maddy AI version diff · 5 comparisons
What changed between versions
Rerevised (04/14/2025)
→
Revised (04/11/2025)
·
4 edits
MODERATE
The bill was revised to clarify its status as being on second reading in the Senate rather than third reading unamended. A new provision was added requiring a $30 filing fee and a two-year construction window for reinstating conditional well permits, while also specifying that prior expiration orders are exempt from certain requirements.
Scope change
The bill now includes a new requirement for a $30 filing fee and a two-year construction deadline for conditional well permits, with an exemption for permits that expired through prior orders.
REQUIREMENT
Added a requirement that conditional well permits must be constructed within two years after issuance and accompanied by a $30 filing fee.
ENFORCEMENT
Added language specifying that the Commission will review its records and evidence provided to determine whether to reinstate conditional permits.
EXEMPTIONS
Added an exemption stating that the new permit requirements do not apply to permits that were formally expired through orders issued prior to the amendment.
TECHNICAL
Updated the revision status from 'Rerevised' to 'Revised' to reflect that amendments were adopted on second reading in the Senate.
Floor votes · Senate Apr 14, 2025 · House Mar 5, 2025
How they voted
32–0
Passed · 2 other
Total votes 34
Apr 14, 2025
D
Democratic22
100% Yea
R
Republican12
83% Yea
Vote distribution
All Yea
All Nay
Mixed
No data
Full legislative history
Actions timeline
Total actions
17
Key actions
7
Committee
6
Jun 3, 2025
Signed into law
Governor Signed
executive
Apr 14, 2025
Upper · Passed
Senate Third Reading Passed - No Amendments
upper
Apr 11, 2025
Upper · Passed
Senate Committee on Appropriations Refer Unamended - Consent Calendar to Senate Committee of the Whole
upper
Mar 27, 2025
Committee
Senate Committee on Agriculture & Natural Resources Refer Unamended to Appropriations
upper
Mar 10, 2025
Introduced
Introduced In Senate - Assigned to Agriculture & Natural Resources
upper
Mar 5, 2025
Lower · Passed
House Third Reading Passed - No Amendments
lower
Mar 4, 2025
Lower · Passed
House Committee of the Whole Amendment - Change from ----- to -----
lower
Mar 3, 2025
Lower · Passed
House Committee of the Whole Amendment - Change from Passed to Lost
lower
Feb 28, 2025
Lower · Passed
House Committee on Appropriations Refer Unamended to House Committee of the Whole
lower
Jan 27, 2025
Committee
House Committee on Agriculture, Water & Natural Resources Refer Amended to Appropriations
lower
Jan 8, 2025
Introduced
Introduced In House - Assigned to Agriculture, Water & Natural Resources
lower
4 primary · 28 co-sponsors
Sponsors
Role
Legislator
Party
State
District
P
Cleave Simpson
RRepublican
P
Dusty Johnson
RRepublican
P
Dylan Roberts
DDemocratic
P
Meghan Lukens
DDemocratic
Co
Andy Boesenecker
DDemocratic
Co
Brianna Titone
DDemocratic
Co
Cathy Kipp
DDemocratic
Co
Chris Richardson
RRepublican
Co
Dafna Michaelson Jenet
DDemocratic
Co
FW
Faith Winter
DDemocratic
Co
Iman Jodeh
DDemocratic
Co
Jarvis Caldwell
RRepublican
Co
Jennifer Bacon
DDemocratic
Co
Jenny Willford
DDemocratic
Ask Maddy
·
AI policy assistant
Ask Maddy about HB 25-1014
Scope: CO
Hi! I can help you understand HB 25-1014. What would you like to know?
Try one of these
i
Maddy answers using official bill text and legislative records. Always verify before sharing.
Sources cited inline